Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

Attendees

DISCUSSION ITEMS LOG

...

Pltfm

...

PLATFORM TOPICS:

Controller to NF Association

...

R5/R6 Topic

...

DISCUSSION ITEMS LOG


CtgryItemWhoNotes

Pltfm


PLATFORM TOPICS:

Controller to NF Association

R5/R6 Topic

See Slides Nov 6, 2018. Development of Controller to NF assignment association S/W.

CDS, VF-C, APP-C, SDN-R, SDN-C; will the CCSDK "merging" of controllers happen in R6?

USE CASE REALIZATION MEETING (Notes 2018-11-6) Ctrl-NF

Pltfm

PLATFORM TOPICS:

Data Persistency, RunTime DB

STATUS: Work for RunTime DB completed, not merged in R4

Dan Timoney moved to R5, one Jira for RunTime DB. One issue about merging.

ONAP code added can take a test ONAP deployment to have the ConfigDB work.

USE CASE REALIZATION MEETING (Notes 2019-01-30) U/C Cross-Interaction, Persistency

5G CONFIGURATION (RunTime DB)CONFIGURATION PERSISTENCE SERVICE R6

Pltfm

PLATFORM TOPICS:

Controller LCM API Evolution

https://wiki.onap.org/download/attachments/50202249/2019-04-09%20ONAP_LCM_API_Evolution_El_Alto.pptx?api=v2

Goals (Architecture Evolution)
  • Target is common LCM API in CCSDK usable by different controller personas to simplify for both clients and controller implementations
  • Support PNFs for applicable LCM operations in a consistent way
  • Enable use of CDS blueprint processor to customize behavior of LCM operations in the 'self-service' category
    • In ONAP R4, CDS can be used for pre/post-instantiation configuration. Generic and model-driven design should allow CDS usage to be extended for additional operations and use cases.
  • Evolution steps that preserve backwards compatibility for clients

Present at the Arch S/C Apr 9 (Tue) second presentation.

Use Cases

USE CASE/5G:

RAN (ORAN-3GPP) Standards harmonization with ONAP

  • Orchestration at the Edge.
  • A1/O1/E2 communications. Edge to ENBs, Telemetry.
  • E2 will not have this info. O1 is I/F for PM counts. Not a management I/F.
  • WG3 (ORAN) is defining this.
  • ONAP w/ O1. Changes w/ O1 interface.
  • How to satisfy A1/O1 and in what time-frame.
  • U/C ORAN - ONAP harmonization. 3GPP ORAN ONAP.
  • Starting a new U/C in 5G. Marge, Vimal, Fred Feisullin
  • Edge inventory & topology. Transport BH consideration w/ real-time near-RT aspects
  • Akraino. MEC. Edge automation (Ramki).

Use Case WIKI: MOBILITY STANDARDS HARMONIZATION WITH ONAP

Use Cases

USE CASE/5G:

Licensing Management

New U/C added to the 5G Use Cases for Licensing Management

Use case Wiki: LICENSING MANAGEMENT

(Oct 8 2019) Arch Samuli presented on Licensing Management. Object development. Modeling S/C.

Modeling work: ONAP R6 Modeling High Level Requirements

Use Cases

USE CASE/5G:

OOF / SON / PCI

PoC for December 2019?

SDN-R south-bound NetConf I/F w/ model

and also integration with Runtime DB work.

Use Cases

USE CASES:

BBS U/C Evolution

BBS Evolution - Slide set linked in R6 proposed U/C. List of proposals & functional requirements.

  1. Change Service - want to use ONAP platform.
  2. Full Closed Loop for Fault Management - CLAMP.
  3. Service Update API (SO) - will be developed

https://wikilf-onap.onapatlassian.orgnet/wiki/download/attachments/6088750416362101/BBS_R5_v1.pptx?version=1&modificationDate=1554180715000&api=v2

Use Cases

USE CASES/5G:

PM Dictionary/FM MD GUI

FM META DATA & PM DICTIONARY in R5
Use Cases

USE CASES/5G:

PNF S/W Upgrade

PNF software upgrade in R6 Frankfurt
Use Cases

USE CASES/5G:

Preonboarding/Onboarding

PNF PREONBOARDING / ONBOARDING in R5
Use CasesUSE CASES:

IoT Service Creation

IoT Create Services on 5G

5G Use Cases in R6 Frankfurt

June 19, 2019

Use Cases

USE CASES:

Modeling gNB/5G RAN

Align, harmonize, reconcile various information models to ONAP model:

Expand & verify model and harmonize with the ONAP internal information & data model:

ETSI SOL001 ... 007 with ONAP internal Model

PNFD modeling (Model S/C)

5G Model (3GPP, RAN)

ORAN (WGs, RAN)

Open ROADM (reconfig optical add/drop multiplexer, Optical)

ONF (Optical)

ISOMII (Optical)

OTCC (Optical transport config & control)

 - Use Cases that need transport models need some model consistency.

 - Try a Use Case with extended ONAP model & real equipment.

ORAN Model PlugFest (Dec 2019)

Use Cases

USE CASES:

5G NRM (Network Resource Model) Configuration

wangyaoguang

Presented at the 2019 June LFN DDF, titled as '5G Provisioning management service to NRM

(Oct 9 2019) Presented at CDS team and discussed with Yuriy and Seshu; presented at Resource Modeling S/C. Slides will be updated and re-presented.

5G Network Resource Model (NRM) Configuration in R6 Frankfurt

Arch

Architecture S/C

PNF POB/OB Flow

Arch S/C Information Flows:

Draft ONAP Information Flows

New Information flow for Preonboarding/Onboarding xNF packages/resources.

ARCHCOM: InfoFlow - Onboard Resource into SDC Flow

TSC

TSC:

PoC Definition

POC definition
TSC

TSC/USE CASES:

Test Automation Progress

Use Case Test Automation

Action Items: Use case subcommittee to reach the Dublin use case owner to provide the following information. what's the current percentage of testing automation regarding your use case and functional requirements; what will be the plan to be 100% and constraints (resources availability etc.)


R6 Frankfurt / M0

Use Case Tracking Template

Need the U/C teams to fill out the Dev. Impacts.

More Generalized Use Case Template (discussed w/ Model team):

Use Case Tracking Template and Use Case Template


VID: Service Models Browser Orchestration

VID: Service Models browser - display orchestration type (macro / a`la carte) use-case.

This use-case requires us to extend the AAI data-model, with an additional field, related to Service Model.

This field will be used later on to indicate in VID the Service Model orchestration type.

A&AI Epic 2594

Jira Legacy
serverSystem Jira
columnskey,summary,type,created,updated,due,assignee,reporter,priority,status,resolution
serverId4733707d-2057-3a0f-ae5e-4fd8aff50176
keyAAI-2594





...

DATETOPICPRESENTERDESCRIPTION
Apr 10, 2019Controller LCM API Evolution
  • Target is common LCM API in CCSDK usable by different controller personas to simplify for both clients and controller implementations
  • Support PNFs for applicable LCM operations in a consistent way
  • Enable use of CDS blueprint processor to customize behavior of LCM operations in the 'self-service' category
    • In ONAP R4, CDS can be used for pre/post-instantiation configuration. Generic and model-driven design should allow CDS usage to be extended for additional operations and use cases.
  • Evolution steps that preserve backwards compatibility for clients

https://wiki.onap.org/download/attachments/50202249/2019-04-09%20ONAP_LCM_API_Evolution_El_Alto.pptx?api=v2

May 1, 2019A&AI GraphGraph Visualizer

Visualizer for A&AI Model Layout

Use Case Realization Call: May 1, 2019

May 8, 2019A&AI Model Browser, Sparky

A&AI developer Model Browser to navigate and viewing attributes, object types & edge view

Recording & Slides: Use Case Realization Call: May 8, 2019

May 15, 2019A&AI Run Time Browser (Sparky)A&AI Run-Time Browser
May 22, 2019Edge Automation Overview & Discussion

Central & Distributed Edge ONAP configuration.

Topics include: Onboarding, Instantiation, Edge Orchestration, A&AI, Architecture, Work-flows, Multi-Tenancy

Use Case Realization Call: May 22, 2019

May 29, 2019Modeling S/C , Use Case Project Teams, Architecture S/C Way of Working

Model S/C (Sub committee) contributions page:

Modeling sub-committee Contributions

https://wikilf-onap.onapatlassian.orgnet/wiki/display/DW/Proposed+ONAP+Release+Process+Updates+for+Information+and+Data+Modeling

Jun 5, 2019Use Case slides for Dev. ForumUse Case Realization Call: June 5, 2019
July 10, 2019R6: PNF Software Upgrade Overview & Discussion

ONAP Read the Docs/R4 Announcements

WIKI: PNF software upgrade in R6 Frankfurt Overview & Presentation

July 24, 2019R6: OOF/SON PCI Use Case Demo, Overview & DiscussionOOF / PCI / SON Use Case Demo
Aug 7, 20195G NRM (Network Resource Model) Configuration U/C Overviewwangyaoguang5G NRM (Network Resource Model) Configuration U/C Overview & Presentation
Aug 14, 2019ORAN Standards Harmonization U/C OverviewORAN Standards Harmonization U/C Overview & Presentation
Aug 21, 2019Modeling Sub-Committee guidelines & Use Case Interactions

Modeling S/C Process Wiki: Proposed ONAP Release Process Updates for Information and Data Modeling

Use Case Tracking Template and Use Case Template

R6 Modeling High Level Requirements Planning Page: ONAP R6 Modeling High Level Requirements

Sept 4, 2019Licensing Management OverviewIntroduction of Licensing Management in R6
Sept 11, 2019SDC & R6 Use Case Impacts DiscussionOfir SonsinoDiscussion with SDC PTL Ofir w/ the Use Case Teams and SDC commitments. See the summary Table for SDC impacting Use Cases.

 

VID & R6 U/C Discuss

Preparation for Technical Conference Antwerp

ittay

Use Case Teams

Discussion with VID PTL (Ittay Stern) for R6 Use Case Impacts discussion and commitments for VID impacting Use Cases

Preparing slides for Use Cases at the Technical Conference Antwerp (for 5G/PNF use cases)

 

A&AI & R6 Use Case Impacts Discussion

Discussion with A&AI PTL (Jimmy Forsyth) and Chandra Cinthala for R6 A&AI Use Case Impacts discussion and commitments.

Use Case Realization Call: September 25, 2019

 

DCAE & R6 Use Case Impacts DiscussionVijay KumarDiscussion with DCAE PTL (Vijay Kumar) for R6 Use Case Impacts discussion and commitments for DCAE impacting Use Cases

 

M1 U/C discussionUse Case Teams

R6 M1 Deadline (Oct 10 2019)

M1 Checklist: Deliverables for Planning Milestone Checklist Template

READ THE DOCS: http://onap.readthedocs.io/en/latest/guides/onap-developer/developing/index.html  > USER GUIDES > Verified Use Cases

and discussion with A&AI (James Forsyth ) continuing discussion from Sept 25.

Network Slicing has two proposals in R6 (LIN MENG CMCC and Swaminathan Seetharaman ). Need to align the two proposals and present at Use Case S/C meeting (Alla G.) and TSC and Architecture next week Oct 14.

 

PoC Planning & DiscussionTracy Van Brakle

Combination Plugfest & PoC 1st week of December bringing together subset of ONAP modules as SMO (svc mgmt orchestration) layer w/ other artifacts from ORAN S/W (LF). LF will publicize. Planned June 2020.

Co-Demo discussion Nokia & Ericsson: Plug Fest Planning Discussion Oct 28, 2019

 

RunTime Config DB

Discussion of the RunTime DB Use Case in R6 Frankfurt which introduces a Common Service Data Layer for a data lake to store configuration and operational parameters.

Component & Flows:

ARC RunTime DB Component Description - R6 Frankfurt

ARCHCOM: InfoFlow - RunTime Config DB Information Flow5G CONFIGURATION (RunTime DB)

CONFIGURATION PERSISTENCE SERVICE R6

 

OOF & R6 Use Case Impacts DiscussionShankar PN

Discussion with OOF PTL (Shankaranarayanan Puzhavakath Narayanan ) for R6 Use Case Impacts discussion and technical details for OOF impacting Use Cases

 

SO & R6 Use Case Impacts DiscussionDiscussion with SO PTL (Seshu Kumar) for R6 Use Case Impacts discussion and commitments.

 

PoC Plugfest Planning & DiscussionTracy Van Brakle

Sync up on the Demo & PlugFest

Thursday Dec 5, 2019 Rutgers OWL Lab (NJ)

 

Network SlicingCMCC-Huawei-Tencent & Wipro-ATT-Amdocs joint Network Slicing proposal

 

No MeetingNo Meeting
x, 2019Discussion of Use Case Template for R7

Filling out, describing and creating the Wiki for a Use Case

Use Case Tracking Template and Use Case Template

Proposed Functional Template for Use Cases

x, 2019Release Manager DiscussionDavid McBride

Discussion with David McBride of the Linux Foundation, the R6 Release Manager regarding practices, wiki page updates, Jira dashboard and what is a use case?

Release Planning: Frankfurt

Frankfurt Release Requirements





...

OOF USE CASE IMPACTS FOR R6

Frankfurt Release Requirements

Image Added

PNF / Preonboarding Onboarding
 . VNF-SDK.

Wiki Page: PNF/VNF PREONBOARDING / ONBOARDING in R6 Frankfurt

SUMMARY: No Impact

PNF / Plug and Play
 

SUMMARY:

DCAE Commits

No Impact

PNF / Software Upgrade

Wiki Page: PNF software upgrade in R6 Frankfurt

SUMMARY: No Impact

PNF / Configuration with NetConf
5G / 5G Service Modeling
SUMMARY: No Impact
5G /
Bulk PM
5G Service Modeling

Wiki Page: 5G

Bulk PM in Frankfurt/R6 

(Spreadsheet/Use Case Team): Indicates impact

SUMMARY: Will nee some further discussion, need some updated flows and better understanding on the flows. Discussion with Oskar & Michela.

RAN SERVICE MODELING & DEFINITION in R6 Frankfurt

SUMMARY: No Impact, Information Modeling work only in R6

5G / Bulk PM

Wiki Page: 5G Bulk PM in Frankfurt/R6

SUMMARY: No Impact.

5G / PM Dictionary
 

SUMMARY: No

DCAE Impact. Marge Agrees. New Artifact & definition.

SUMMARY: Needs more discussion with Marge. May need to be update, Marge will sync Vijay & Damian.

5G

Impact.

5G / 5G FM Meta Data

Wiki Page: FM META DATA & PM DICTIONARY in R6 Frankfurt

SUMMARY: No Impact

5G / OOF SON (PCI)
 

SUMMARY: Needs Clarification

5G / E2E Network Slicing

Wiki Page: NETWORK SLICING PoC in R6 Frankfurt (Obsolete)

No Impact (none listed in Wiki)

SUMMARY: (No impact?)

5G / RAN ORAN 3GPP Standards Harmonization

Wiki Page: MOBILITY STANDARDS HARMONIZATION WITH ONAP

(Spreadsheet/Use Case Team): Indicates impact

SUMMARY: (see CM Notify VES event)

5G / Runtime DB

Wiki Page: 5G CONFIGURATION (RunTime DB)

SUMMARY: (impact captured in the CM notify VES impact)

5G / NRM CM w/ RESTful HTTPSNo Impact ?5G / Licensing ManagementNo Impact. Modeling & architecture work for R6.SERVICE RESOLVERNo Impact?? (Wiki lists nothing) ??SCALING

Wiki Page: Scaling Use Case (Frankfurt)

SUMMARY: Needs Investigation.

Mobile Service Chaining & Service Selection

Wiki Page: MOBILE SERVICE CHAINING

SUMMARY: Need Investigation.

BBS

(Spreadsheet/Use Case Team): Indicates impact

SUMMARY: No impact

CCVPN

Wiki Page: CCVPN Use Case in Frankfurt Release

(Spreadsheet/Use Case Team): Indicates impact

SUMMARY: Needs Investigation

Control Loop

(Spreadsheet/Use Case Team): Indicates impact

SUMMARY: DCAE some things are committed. Separate requirements created.

Multi Domain Optical Service L0/L1 Orchestration

Wiki Page: Multi-domain Optical Network Services

(Spreadsheet/Use Case Team): Indicates impact

SUMMARY: Needs Impact assessment.

CHANGE MANAGEMENT

Wiki Page: Change Management Frankfurt Extensions

(Spreadsheet/Use Case Team): No impact listed

SUMMARY:  No impact.

HPAWiki Page: Continuation of HPA

SUMMARY: Needs investigation

RUN TIME SECURITYNo Impact?? (Wiki lists nothing)K8S Based Cloud Region Support

Wiki Page: K8S based Cloud region support (Continue from R4)

(Spreadsheet/Use Case Team):

SUMMARY: Needs investigation

DAaaS(Spreadsheet/Use Case Team): Indicates impact3rd Party Operational Domain Manager

Wiki Page: Third-party Operational Domain Manager

SUMMARY: Needs investigation

 

SUPPORTING DOCUMENTATION

DocumentFile

Main objectives want south-bound interface from SDN-R to network & ORAN.

E#1 MODEL ALIGNMENT - Harmonize ORAN & 3GPP. I/F from ORAN to ONAP. O1 and A1 interface. O1 NetConf / Yang I/F. Continuing that work. For O1, reuse work done in R4. in R6 ready to continue work w/ Yang model - want to align with ORAN Yang model. Focused on what models are available and which to use. model of 5G RAN network. Focused on some aspects. Every 5G cell has PCI value & nbr relations to 5G cell, CellID, nbr relations, PCI values. Done in a scripted manner Yang model > use it for SDNR SthBnd I/F. Schema used in RTCfgDB. Focused on PCI & Neighbor relations. Use RAN sim to generate config changes for the SON U/C.

E#2: NOTIFICATIONS - Config changes. Info from RAN > SON. Netconf notif & VES msgs. Input from RAN to SON project U/C using VES. VES from FM/PM KPIs. Add VES Notif from RAN simulator via VES. Reuse with RTCgfDB work; consumed by mS. Input from RAN to SON.

E#3: POLICY - When control loop > policy. Control Loop Coordination (CLC) if 2x Control Loops. PCI & cANR. Use CLC to coordinate between 2x control loop commands.

E#4: OPTIMIZATION ENHANCEMENTS - mS & OOF. Can optimizations can be enhanced. SON functions ++. What's feasible on basis, new Jira items. Enhancements of Algorithms.

Q: How far along are we to RAN management? A: Martin Skorupski PTL of O1 I/F in ORAN. Take 3GPP models Martin has script Yang model "cleanup". Working with ORAN to clean up model. Take part of model > RTCfgDB. Martin has some Yang files clean up work to be done.

Use Case Spreadsheet: Indicates Impact

Release Requirements Page: Indicates Change (Frankfurt Release Requirements)

SUMMARY: Not to much S/W OOF changes. If enhancements affects OOF Swami will notify Shankar. Algorithmic enhancements mentioned in Jira.

Jira Legacy
serverSystem Jira
columnskey,summary,type,created,updated,due,assignee,reporter,priority,status,resolution
serverId4733707d-2057-3a0f-ae5e-4fd8aff50176
keyOPTFRA-616

5G / E2E Network Slicing

Wiki Page: NETWORK SLICING PoC in R6 Frankfurt (Obsolete)

Use Case Spreadsheet: Indicates Impact

Release Requirements Page: Indicates Change (Frankfurt Release Requirements)

Presentation made on ARch S/C call  

SUMMARY: (N-

5G / RAN ORAN 3GPP Standards Harmonization

Wiki Page: MOBILITY STANDARDS HARMONIZATION WITH ONAP

Focus on Fault mgmt Performance. O1 for ORAN/ONAP alignment.

SUMMARY: -

5G / Runtime Config DB

Wiki Page: 5G CONFIGURATION (RunTime DB)

VES CMNotify used by RTCfgDB also used by SON U/C.

Team Meetings: Friday 9AM (EST USA) https://zoom.us/j/230322363

SUMMARY: -

5G / NRM CM w/ RESTful HTTPS

Wiki Page: 5G Network Resource Model (NRM) Configuration in R6 Frankfurt

SUMMARY: No Impact ?

5G / Licensing Management

Wiki Page: LICENSING MANAGEMENT

SUMMARY: No Impact, Modeling & architecture work only for R6.

SERVICE RESOLVER

Wiki Page: Service Resolver

SUMMARY: No Impact ? (Wiki lists nothing) ??

SCALING

Wiki Page: Scaling Use Case (Frankfurt)

SUMMARY: -

Mobile Service Chaining & Service Selection

Wiki Page: MOBILE SERVICE CHAINING

SUMMARY: -

BBS

Wiki Page:

(-

SUMMARY: No impact

CCVPN

Wiki Page: CCVPN Use Case in Frankfurt Release

Release Requirements Page: Indicates Change (Frankfurt Release Requirements)

SUMMARY: -

Control Loop

Wiki Page: Control Loop Sub Committee Frankfurt Release Planning

Policy has updated lifecycle API, dependent projects have updated APIs.

SUMMARY: -

Multi Domain Optical Service L0/L1 Orchestration

Wiki Page: Multi-domain Optical Network Services

-

SUMMARY: Needs Impact assessment.

CHANGE MANAGEMENT

Wiki Page: Change Management Frankfurt Extensions

Use Case Spreadsheet: Indicates Impact

Lukasz Rajewski  - OOF impact

SUMMARY:  Needs Investigation.

HPAWiki Page: Continuation of HPA

Use Case Spreadsheet: Indicates Impact

Release Requirements Page: Indicates Test Only (Frankfurt Release Requirements)

SUMMARY: Needs investigation.

RUN TIME SECURITY

Wiki Page: Run time Security using ISTIO - as a POC

SUMMARY: -

K8S Based Cloud Region Support

Wiki Page: K8S based Cloud region support (Continue from R4)

-

SUMMARY: -

DAaaS

Wiki Page: Distributed Analytics as a Service (Continuation from R4)

Use Case Spreadsheet: Indicates Impact

SUMMARY: Needs Investigation

3rd Party Operational Domain Manager

Wiki Page: Third-party Operational Domain Manager


SUMMARY: -

 

SUPPORTING DOCUMENTATION

DocumentFile

OOF R6 Impacts Slide set

Presented by:

Shankaranarayanan Puzhavakath Narayanan

View file
nameFrankfurtOOFimpacts.pdf
height250

R6 Use Case Analysis & Spreadsheet

View file
nameR6Frankfurt-UseCaseImpactsInteract_25Sept2019v4.xlsx
height250

Placement selection solver

This describes how Placement selection solver works: https://lf-onap.atlassian.net/wiki/pages/viewpage.action?pageId=16254225

Selection Optimization Guide

OOF-HAS Homing Specification Guide

https://docs.onap.org/en/elalto/submodules/optf/has.git/docs/sections/homingspecification.html

RECORDING

RecordingFILE
Zoom Video & Audio (MP4))

View file
namezoom_0.mp4
height250

Audio Only (M4A)

View file
nameaudio_only.m4a
height250

Playback (M3U)

View file
nameplayback.m3u
height250

Chat (Txt)

View file
namechat.txt
height250
View file
namemeeting_saved_chat.txt
height250