Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

Project NameEnter the name of the project
Target Release NameBeijing
Project Lifecycle StateIncubation. Refer to ONAP Charter, section 3.3 Project Lifecycle for further information
Participating Company Amdocs, AT&T, China Mobile, Huawei, Orange, Tech Mahindra,

...

Sub-components are repositories and are consolidated in a single centralized place. Edit the Release Components name for your project in the centralized page.

...

AreaActual LevelTargeted Level for current ReleaseHow, EvidencesComments
PerformanceNANAvvp is a stand alone tool not a platform component
  • 0 -- none
  • 1 – baseline performance criteria identified and measured
  • 2 & 3 – performance improvement plans created & implemented
StabilityNANAvvp is a stand alone tool not a platform component
  • 0 – none
  • 1 – 72 hours component level soak w/random transactions
  • 2 – 72 hours platform level soak w/random transactions
  • 3 – 6 months track record of reduced defect rate
ResiliencyNANAvvp is a stand alone tool not a platform component
  • 0 – none
  • 1 – manual failure and recovery (< 30 minutes)
  • 2 – automated detection and recovery (single site)
  • 3 – automated detection and recovery (geo redundancy)
SecurityNA0NA1vvp is a stand alone tool not a platform component
  • 0 – none
  • 1 – CII Passing badge + 50% Test Coverage
  • 2 – CII Silver badge; internal communication encrypted; role-based access control and authorization for all calls
  • 3 – CII Gold
ScalabilityNANAvvp is a stand alone tool not a platform component
  • 0 – no ability to scale
  • 1 – single site horizontal scaling
  • 2 – geographic scaling
  • 3 – scaling across multiple ONAP instances
ManageabilityNANAvvp is a stand alone tool not a platform component
  • 1 – single logging system across components; instantiation in < 1 hour
  • 2 – ability to upgrade a single component; tracing across components; externalized configuration management
UsabilityNANAvvp is a stand alone tool not a platform component
  • 1 – user guide; deployment documentation; API documentation
  • 2 – UI consistency; usability testing; tutorial documentation

...

Risk identifiedMitigation PlanContingency Plan
To fill outTo fill outTo fill out
  • Resources

Fill out the Resources Committed to the Release centralized page.

  • Release Milestone

...