DRAFT PROPOSAL FOR COMMENTS

The content of this template is expected to be fill out for M1 Release Planning Milestone.

...

Project NameEnter the name of the project
Target Release NameEnter the name of the release you are targeting to deliver
Project Lifecycle StateEither Incubation, Core, Mature. Refer to ONAP Charter, section 3.3 Project Lifecycle for further information
Participating Company List the company participating in this release. At least 3-4 organizations, including an operator are recommended.

...

Describe the problem being solved by this release

...

Requirements

Describe the use case this release is targeted for (better if reference to customer use caserequirements).

Minimum Viable Product

Describe the MVP for this release.

...

Indicate the outcome (Executable, Source Code, Library, API description, Tool, Documentation, Release Note..., etc) of this release.

Deliverable NameDeliverable Description
To fill outTo fill out

...

Sub-components are repositories and are consolidated in a single centralized place. Edit the Release Components name for your project in the centralized page.

...

Indicate where your project fit within the ONAP Archiecture Architecture diagram.

Block and sequence diagrams showing relation within the project as well as relation with external components are expected.

Anyone reading this section should have a good understanding of all the interacting modules.

Platform Maturity

Refering to CII Badging Security Program and Platform Maturity Requirements, fill out the table below by indicating the actual level , the targeted level for the current release and the evidences on how you plan to achieve the targeted level.

...

  • 0 -- none
  • 1 – baseline performance criteria identified and measured
  • 2 & 3 – performance improvement plans created & implemented

...

  • 0 – none
  • 1 – 72 hours component level soak w/random transactions
  • 2 – 72 hours platform level soak w/random transactions
  • 3 – 6 months track record of reduced defect rate

...

  • 0 – none
  • 1 – manual failure and recovery (< 30 minutes)
  • 2 – automated detection and recovery (single site)
  • 3 – automated detection and recovery (geo redundancy)

...

  • 0 – none
  • 1 – CII Passing badge + 50% Test Coverage
  • 2 – CII Silver badge; internal communication encrypted; role-based access control and authorization for all calls
  • 3 – CII Gold

...

  • 0 – no ability to scale
  • 1 – single site horizontal scaling
  • 2 – geographic scaling
  • 3 – scaling across multiple ONAP instances

...

  • 1 – single logging system across components; instantiation in < 1 hour
  • 2 – ability to upgrade a single component; tracing across components; externalized configuration management

...

  • 1 – user guide; deployment documentation; API documentation
  • 2 – UI consistency; usability testing; tutorial documentation

...

Please fill out the centralized wiki page: Frankfurt Release Platform Maturity


  • API Incoming Dependencies

List the API this project is expecting from other projects.
Prior to Release Planning review, Team Leads must agreed on the date by which the API will be fully defined. The API Delivery date must not be later than the release API Freeze date.

Prior to the delivery date, it is a good practice to organize an API review with the API consumers.

...

Gaps identifiedImpact
To fill outTo fill out
  • Known Defects and Issues

Provide a link toward the list of all known project bugs.

Jira Legacy
serverSystem Jira
columnskey,summary,type,created,updated,due,assignee,reporter,priority,status,resolution
maximumIssues20
jqlQueryproject=sanbox and issuetype in (bug)
serverId4733707d-2057-3a0f-ae5e-4fd8aff50176

Please refer to Frankfurt Defect Status


  • Risks

List the risks identified for this release along with the plan to prevent the risk to occur (mitigation) and the plan of action in the case the risk would materialized (contingency).

...

Please update any risk on the centralized wiki page - Frankfurt Risks

  • Resources

Fill out the Resources Committed to the Release centralized page.

  • Release Milestone

The milestones are defined at the Release Level and all the supporting project agreed to comply with these dates.

...

DateProjectDeliverable
To fill outTo fill outTo fill out
  • Documentation, Training

    Highlight the team

Please update the following centralized wiki: Frankfurt Documentation

That includes

  • Team contributions to the specific document related to he project (Config guide, installation guide...).
  • Highlight the team Team contributions to the overall Release Documentation and training asset
  • High level list of documentation, training and tutorials necessary to understand the release capabilities, configuration and operation.
  • Documentation includes items such as:
    • Installation instructions
    • Configuration instructions
    • Developer guide
    • End User guide
    • Admin guide
    • ...

...