Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

Agenda:

  1. Casablanca goals are being defined here https://wiki.onap.org/display/DW/Casablanca+goals
  2. Code Coverage needs to be improved to 80% - require TechM and IBM resources to commit for the plan
    1. SDK repo - Naveen is working this. update on the SDK coverage?
    2. Prasad/Swapnali - Please use Epic - PORTAL-268 - for code coverage - PORTAL-273; for sonar issues - PORTAL-247; (focused on Portal repo).
    3. Portal's Javascript unit test plan? Yes it should be done in Casablanca- Prasad/Swapnali (Manoop to followup with TSC on the requirement on JS code coverage), Karma - look into it ( from RobertYatindra looking into it) plugin like jacoco - ?? ; check out this webpage https://blog.akquinet.de/2014/11/25/js-test-coverage/ ; for  examples see https://github.com/webpack/webpack/tree/8b19f20b40f7942856e3091e15394e9abca87b24/test (from Lorraine)
  3. Design for Angular update - Saravanan to provide the Design review and plan; listed out items, testing one screen, needs a week for this , another week for design document
    1. Portal Admin screen - for POC to migrate to latest Angular - Saravanan (Design discussion to understand the impact - Thurs 05/31).
    2. Demo with one screen with Angular 5, Karma testing - Mon June 11 - Sireesh to send the meeting inviteDemo shown to Sunder
    3. Bring the application with Angular 1 and latest versions - Saravanan
    4. Estimate of the migration to latest Angular - Saravanan
    5. fonts and icons abstraction so that they can be switched with a flag configuration - Saravanan
  4. SDK code coverage dropped to 49% on master - every new code commit from any developer must make sure that that the code coverage remains same and improves - Kishore to push the code coverage mostly related to AAF changes. - The latest commit is abandoned - new commit is submitted (https://gerrit.onap.org/r/#/c/51087/) - it is under review (verify the comments under the abandoned commit are addressed - plan is to submit new commit?here is the abandoned commit - https://gerrit.onap.org/r/#/c/49785/).
  5. MUSIC jar 2.5.5 is missing and failing Jenkins jobs.
  6. Lorraine to run grep scan for ecomp keyword  - done - Review with Sunder/Manoop - will send them result in email
    1. Look for the vm host names in the files - to clean up - Lorraine already made commit for this changes - Hima can help if requires java file changes
  7. Design to be scheduled for Simplify etc/hosts, OOM and AAF changes - Sunder (forward to Ritesh and team too)
  8. Award nominations - ONAP Community Awards: Beijing Release - Nominations: Close 6 PM Pacific time, June 14 - Voting will take place June 15 -- 19

Attendees:

Saravanan, Sireesh, Farhan, Lorraine, PrasadImage Added

Discussion Items:

  1. OOM integration and enhancement plans for Casablanca - Manoop/Sunder
    1. deployment, scalabilty of the platform issues (Start creating user stories based on the design review)
    2. Music cassandra as a service - integration? - Sunder
    3. Music team to provide DB as a service - working with Bharat (pending proposal and approval from ONAP architecture)
  2. AAF integration plan for Casablanca - Sunder/Farhan/Manoop
    1. Truning Turning ON AAF and starting using role management for partners
    2. AAF certificate management integration (both for FE HTTPs and BE rest API calls)
  3. Security issues from Nexus-IQ plan for Casablanca - Farhan
    1. Angular will be a problem - How can we upgrade Angular - Saravanan
    2. Possibly in phases - In casablanaca, start removing the vulnerabilities that are maeked as - "Not vulnerable in ONAP" - CLM scan report - portal-Build-20180613-155656.pdf (Ritesh to review the report to understand the impact of changes)
    3. Fix pending Fortify issue
  4. Internationalization language support plan for Casablanca - PORTAL-267 - Leimeng to followup
    1. Choose language/internal components
    2. In discussion by larger community (Use Case UI Team), expecting implementation details
    3. Leimeng has sent email to Tao Shen shentao@chinamobile.com on this topic and is waiing fr his return email
  5. API Versioning and Backward Compatibility (Technical Debt) - Analysis on pending changes? 
  6. Performance 
    1. Memory usage optimization - Hibernate 4 memory leaks issue
    2. Split DB, Portal and SDK docker images - build portal and SDK docker images separately from respective jenkins jobs rather than in single jenkins job (which have strong dependency on branch version) 
    3. UI upgrades - Angular, Bower
    4. Simplify deployment by avoiding the etc/hosts file entries - Sunder to estimate on this
    5. Logging enhancements - 
      Jira Legacy
      serverSystem Jira
      serverId4733707d-2057-3a0f-ae5e-4fd8aff50176
      keyPORTAL-170
  7. Testing
    1. CSIT test for new Casablanca features - Sunder to schedule a session to go over the new features.
    2. Convert ECOMP selenium tests into CSIT ONAP Robot Framework tests - Sunder/Sireesh - Sunder to provide the ECOMP test scripts to Sireesh.
    3. Enable JavaScript Unit tests. (How will this impact the angular upgrade? Will these unit tests work as is even after upgrade?).
    4. Code Coverage needs to be improved to 80% on both portal and portal/sdk repos.
  8. Defect fixes


...

  1. M0 - dev kick-off, Nov 16
  2. M1 - planning Jan 16
  3. M2 Functionality Freeze  →  fill in the contents by Manoop & Leimeng - done
  4. M3 API/Data Model Freeze 
  5. M4 Code Freeze 
  6. RC0 Checklist
  7. RC1 Checklist 
  8. RC2 Checklist 
  9. Release Delivery