Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

Table of Contents

Summary

Stability test plan was triggered for 72 hours injecting vCPE, vFirewall, vDNS, VOLTE onset & abatement (where applicable) messages in Drools PDP installed in windriver lab (PFPP).
The test environment was set-up with simulated components (i.e. A&AI, VFC and SO) using "features enable controlloop-utils" and APPC response messages were injected in test plan wherever applicable. 

...

Drools engine processing time

Avg. Average drools processing time for each use case using simulated components

...