This page hosts information about discussion calls dedicated to service modeling .

Upcoming call

Logistics

  • TBA

 

Proposed Agenda

  • TBA

during R2 release cadence.

More information about ongoing work targeting R3+ is hosted here: ONAP R3+ Service Modeling Discussion Calls

Table of Contents
maxLevel3

Past calls

20180330

Logistics

Intercontinental Los Angeles Downtown, sponsored by Linux Foundation Network Echo Park Meeting Room 5th floor

...

Meeting room: https://zoom.us/j/882442618

Part of the ONAP Friday morning modeling session in ONS 2018 (30 March 2018)

Agenda

0 Agenda bashing

Service session
1 Yangxu - Service IM Status and Observations
2 John - MEF MCM Proposal
3 Jianguo - ONAP R3 Service IM Proposal
4 Lingli - Service IM Usecase Proposal (Skipped for time limitation)
5 Discussion on next steps

Resource DM session
6 Michael - ONAP R3 Resource DM Proposal Feedback
7 Alex - Kicking off ONAP R2 Resrouce DM Open Issues (Skipped for time limitation)

Onsite Participants

Hui DENG , Xinhui Li, Lingli Deng , Seshu Kumar, Parviz Yegani, Alex Vul , John Strassner , Xu YANG

...

Tal Liron, Yoav Kluger, Catherine Lefevre

Meeting minutes

1) R2 service modeling will be the same as R1 servcie modeling which is confirmed by SDC/SO/HPA/VNFSDK/AAI/VFC

...

  • Cardiality correction by John
  • Suggest to move to composite pattern  instead of recursive aggregation   
  • Decoration pattern is FFS   
  • Terminology need to be defined (e.g. clarifications on service component as with the one in MEF)

...

20180325

Agenda

  • ONAP R2+ service IM Discussion Review and Proposal

...

The current status of service IM and my observations (Xu Yang)  (Skipped for time limitation)
Discussion (Partially covered during the flow of discussion)

Minutes

• ONAP R2+ service IM Discussion Review

...

...

  • The current status of service IM and my observations (Xu Yang) - delayed due to time limitation
  • Discussion for follow-ups
  • Lingli provides customer-facing business scenarios as input for service model discussion and comparison by Tuesday;
  • For Friday workshop, each presenter (including SDOs/individuals) is expected to provide their respective proposal models and with the context of customer facing business scenario;
  • Based on which, the team is expected to develop a more clearly scoped target and collaborative pattern for R3+.

20180321

Agenda

  • Agenda bashing
  • R2 Status summary and priority

  • ONS workshop agenda

  • R2 VNFD DM clean up discussion (added for R2 priority)
  • Network Service Descriptor R2 Implemenation Discussion
  • Service Order Model (added to the agenda, but deferred to next meeting due to time limit)

Minutes

  • Agenda bashing
    Andy suggested to add service order model to the agenda.
    Hui suggested to add VNFD DM discussion for finalizing R2 spec.
  • R2 Status summary and priority
    Agreed to continue work on nsd for R2 implemenation, and defer WAN descriptor discussion for R3 discussion starting next call.
    And service order proposal to R3 discussion.

  • ONS workshop agenda
    Deng Hui suggest to

    1. Add project PTL to explain how they implement service today SDC, SO, A&AI
    2. YANGXU is presenting the relationship between SERVICE and network service
    3. Multi SDO presentation about service IM , tmf/mef/onap
    4. Offline to build tiger team to design service IM

    Andy suggest to

    1. Add service order model
    2. Further Discuss NS 
  • Network Service Descriptor R2 Implemenation Discussion
    NS model as service component added in the R2.
    Maopeng and Anatoly need to discuss more tosca grammar details related to NS model and update the NS model.
  • Wrap up

20180313

Agenda

Minutes

  • Agenda bashing
    Added a time slot for Network service VL Discussion.
  • WAN service IM/DM Proposal (Zhuoyao)

    • WAN (Service Component) IM
      Need clarifications on relationship with ONF CIM and/or TAPI model.

    • WAN (Service Component) DM
      Need clarificationson relationship with parallel TOSCA Data Modeling practice at ONF and avoid collision if possible (e.g. in terms of naming conventions)

  • Network Service Discussion
    • NetworkService Model Diagram (Maopeng)
      Add reference to IFA 014 2.4.1 when appropriate.
      Need sync with SDC/VF-C for implementation plan in R2.
    • Network service VL Discussion  (Nagesha)
      Very briefly done due to time limit. Will provide wiki page contribution and kick off further discussion.
  • Wrap up

Recordings

20180307

Agenda

Minutes

  • Agenda bashing (Lingli)
    No comments received and proceeded with the proposed agenda.
  • Service IM recap and update(Kevin) 
    No update made to the clean version as agreed back in December F2F. (Kevin)
    Concerns raised about potential alignment conflicts with MEF service models, which would be discussed further in March F2F.
     (Mehmet and others)

  • Service DM proposal (Maopeng)
    It is clarified that both network service and wan service are derived from service component. The network service as it currently represented is a simplified subset of Network Service as define by ETSI NFV, without VNFFG or Deployment Flavour etc. (Maopeng)
    UML class diagram for corresponding IM design was requested to be added. (Andy)
    More sophisticated design for virtual link might need to be considered for some service provider scenario, contribution to be expected in later discussion. (Thinh)
  • WAN service modeling proposal (Zhuoyao)
    It is recognized as a good approach to proceed, suggest to add consideration for covering both intra-DC connectivity and inter-DC connectivity for underlay. (Gil & Andy)
  • Wrap up
    All participants are encouraged to leave their comments to the wiki discussion pages for further discussion and better tracking.

Recording