Overview

Project NameEnter the name of the project
Target Release NameDublin Release
Project Lifecycle StateIncubation. Refer to ONAP Charter, section 3.3 Project Lifecycle for further information
Participating Company AT&T, Tech Mahindra, Ericsson, Orange, IBM

Scope

What is this release trying to address?

The Dublin Release will be focusing on the following areas:

  • Upgrade of ODL to Fluorine SR2 (CCSDK dependency)
  • Platform Maturity (i.e., S3P items)  https://wiki.lf-onap.org/pages/viewpage.action?pageId=16003367, https://wiki.onap.orgatlassian.net/wiki/display/DW/Dublin+Release+Platform+Maturity
    • Brown→ Jason's goal Green color → Target level ( details see Platform Maturity below)
    • Performance:  Level 1, Level 2 (Stretch)
      • Level 1: baseline performance criteria identified and measured  (such as response time, transaction/message rate, latency, footprint, etc. to be defined on per component)
      • Level 2: performance improvement plan created 
      • unzip feature.zip during building docker.
      • Remove un-used bundles from CCSDK’s odlsli - depends on CCSDK
    • Stability: Level 2
      Level 1 (remain test coverage 50%)
    • Resiliency: Level 2
      • Level 2: support automated failure detection & rerouting 
        • within a single geographic site
        • stateless components: establish baseline measure of failed requests for a component failure within a site 
        • stateful components: establish baseline of data loss for a component failure within a site
      • OOM: move to variable for database’s user/password
      • CSIT OOM - Integration team
    • Security:
      Absolute Minimum expectation:
    • CII badging passing level
    • Continuously retaining no critical or Level 1, level 2 (Stretch)
      • Level 1: CII Passing badge
        • Including no critical and high known vulnerabilities > 60 days old
      • Level 2: CII Silver badge, plus:
        • All
      • communication
        • internal/external system communications shall be able to be encrypted: there is http internal connection between CDT and APPC, we need to find the resource to migrate from http to https.
        • All internal/external service calls shall have common role-based access control and authorization
      • .
      • Desired expectation is full CII badging silver level, if not 75% towards that
        • using CADI framework.
    • Scalability: Level 1
      • Level 1: supports single site horizontal scale out and scale in, independent of other component
      • APPC does not support dynamic cluster configuration in k8s only support static cluster configuration
      • Clustering env with downstream: netconf,  ansible
      • Using Alpine linux distribution docker image as base.
    • Manageability:Level1, Level 2 (Stretch)
    • Usability: Level 21
      • Level
      • 2
      • 1:
      Documentation
          • User guide created
          • Deployment documentation
          • API documentation
          • Adherence to coding guidelines
    • Documentation updates (readthedocs) for Dublin, such as, but not limited to:
      • LCM API Guide
      • Release Notes
      • CDT GUI Guide
    • Code Coverage for CDT (Javascript) - TBD, no commitment at this stage
    • Use Cases
      • Closed Loop / E2E AutomationIntegrate automation test
      • Change Management - APPC will continue supporting it.

    Use Cases

    Describe the use case this release is targeted for (better if reference to customer use case).

    The use cases supported in Beijing release will continue to be supported as part of regression assuming all other components do likewise.

    APPC will contribute partially to the following use cases as part of the functional requirements.

    • TBD

    ...

    • Closed Loop / Integrate automation test
    • Change Management (will be done by Orange team)

    Minimum Viable Product

    Same as was defined for Casablanca, but with the adding of increasing better performance for starting application, geo-redundancy etc. For details, please see above on S3P section

    Functionalities

    List the functionalities that this release is committing to deliver by providing a link to JIRA Epics and Stories. In the JIRA Priority field, specify the priority (either High, Medium, Low). The priority will be used in case de-scoping is required. Don't assign High priority to all functionalities.

    Epics

    Jira Legacy
    serverSystem Jira
    columnskey,summary,type,created,updated,due,assignee,reporter,priority,status,resolution
    maximumIssues20
    jqlQueryproject=appc and issuetype in (epic) and fixVersion = "Dublin Release"
    serverId4733707d-2057-3a0f-ae5e-4fd8aff50176

    Stories

    Jira Legacy
    serverSystem Jira
    columnskey,summary,type,created,updated,due,assignee,reporter,priority,status,resolution
    maximumIssues20
    jqlQueryproject=appc and issuetype in (story) and fixVersion = "Dublin Release"
    serverId4733707d-2057-3a0f-ae5e-4fd8aff50176

    Longer term roadmap

    The long term road map is to achieve all the goals outlined in the approved project proposal; to be fully model and standards driven, be agnostics and make no assumptions about the network. Support configuration and lifecyle management of VNF/VNFC in a generic fashion so that on-boarding any new VNF/VNFC is just a matter of configuration and data. Longer term items include:

    • Align to the controller architecture proposed as part of ONAP by the architecture team.
    • Work with SDNC team to converge on a single controller design tool
    • Support different types of clouds, currently only support Openstack;

    Release Deliverables

    Indicate the outcome (Executable, Source Code, Library, API description, Tool, Documentation, Release Note...) of this release.

    ...

    Deliverable NameDeliverable DescriptionDeliverable Location
    "App-c Image" Docker ContainerExecutableDocker images available on nexus3
    Java Source CodeThe Java code for the main App-c components.appc Git repository
    Deployment ScriptsLinux shell scripts and Maven pom files used to generate the Docker containers. appc/deployment Git repository
    Directed Graph Xml Files (DGs)Xml files define the directed graphs which are installed to database during startup and are used to determine actions taken by app-c appc/deployment Git repository
    Yang Model Files Yang files are used to define the LCM actionappc Git repository
    Property Files Property files are used to define values that may need to be changed depending on the environment app-c is run in.appc Git repository
    CDT toolan APP-C Design Tool enabling VNF owners to create templates and other artifacts used by APP-C Configure actions (used to apply a post-instantiation configuration) as well as other life cycle commandsappc/cdt Git repository
    Parent RepoThe repository for the parents pom files.appc/parents Git repository

    Sub-Components

    List all sub-components part of this release.
    Activities related to sub-components must be in sync with the overall release.

    Sub-components are repositories and are consolidated in a single centralized place. Edit the Release Components name for your project in the centralized page.

    ONAP Dependencies

    List the other ONAP projects you depend on.

    ...

    • SDC: Rest based interface exposed by SDC. APPC receives notifications from SDC on VNF information. SDC team provides an SDC Listener, which is used by APPC. (Currently we have no use case for this, although supported)
    • AAI: APPC retrieves and updates VNF data from/to AAI.
    • DMaaP: Message bus for communication with other components in the solution (SDC, DCAE, MSO, Portal, OOM)
    • CCSDK - APPC currently gets ODL & DB package from CCSDK; CCSDK and APPC currently must align on ODL version. 
    • AAF - AAF is used for ODL API authorization
    • MultiVIM - APPC can access Openstack via MultiVIM or CPD-PAL. MultiVIM is optional for APPC at this stage. Support of MultiVIM is limited to the Generic_Restart action only.

    Architecture

    High level architecture diagram

    At that stage within the Release, the team is expected to provide more Architecture details describing how the functional modules are interacting.

    Indicate where your project fit within the ONAP Archiecture diagram Dublin+Architecture.

    Block and sequence diagrams showing relation within the project as well as relation with external components are expected.

    ...

    For details on the APPC architecture, refer to the APPC User Guide.


    Platform Maturity

    Refering to to CII Badging Security Program and Platform Maturity Requirements S3P, fill out the table below by indicating the actual level , the targeted level for the current release and the evidences on how you plan to achieve the targeted level.

    • Third Party Products Dependencies

    Third Party Products mean products that are mandatory to provide services for your components. Development of new functionality in third party product may or not be expected.
    List the Third Party Products (OpenStack, ODL, RabbitMQ, ElasticSearch,Crystal Reports, ...).

    Name

    ...

    In case there are specific dependencies  (Centos 7 vs Ubuntu 16. Etc.) list them as well.

    • Testing and Integration Plans

    Provide a description of the testing activities (unit test, functional test, automation,...) that will be performed by the team within the scope of this release.

    Describe the plan to integrate and test the release deliverables within the overall ONAP system.
    Confirm that resources have been allocated to perform such activities.

    • CSIT tests added as part of R1 will continue to be supported in R3
    • Pairwise testing will be done in the WindRiver Dev lab similar to what was done in R3.
    • Epics are created to track testing activities to address Platform Maturity items.
    • Gaps

    This section is used to document a limitation on a functionality or platform support. We are currently aware of this limitation and it will be delivered in a future Release.
    List identified release gaps (if any), and its impact.

    ...

    • Known Defects and Issues

    Provide a link toward the list of all known project bugs.

    Jira Legacy
    serverSystem Jira
    columnskey,summary,type,created,updated,due,assignee,reporter,priority,status,resolution
    maximumIssues20
    jqlQueryproject=appc and issuetype in (bug) and affectedVersion = "Beijing Release" AND fixVersion = "Casablanca Release"
    serverId4733707d-2057-3a0f-ae5e-4fd8aff50176

    • Risks

    List the risks identified for this release along with the plan to prevent the risk to occur (mitigation) and the plan of action in the case the risk would materialized (contingency).

    Risk identifiedMitigation PlanContingency PlanODL upgrade to Oxygen & DB to MariaDB - depends on CCSDK projectsCCSDK team has started work early on these two dependencies; They are currently telling us they plant o have these ready at start of Casablanca.Fall back to Nitrogen & MySQL (same as Beijing)SO dependency to delivery needed data to support the ScaleOut use case - need to provide vf-module-id of the vDNS scaled?Continue using the flow as designed in BeijingAPPC needs data to be in AAI in order to support the ConfigScaleOut use case for retrieval of the configuration data. Either SDNC (or SO) must write this data into AAI after the instantiation event happens. Continue using the flow as designed in BeijingDMaaP support of Secure Topics?
    AreaActual LevelTargeted Level for current ReleaseHow, EvidencesComments
    Performance00

    1

    0

    2 -

    - none
  • 1 – baseline performance criteria identified and measured
  • 2 & 3 – performance improvement plans created & implemented
  • Stability

    1 - project team

    2 - Integration team

    Integration team did a 72 hour test in BeijingStretch goal

    Jira Legacy
    serverSystem Jira
    columnskey,summary,type,created,updated,due,assignee,reporter,priority,status,resolution
    serverId4733707d-2057-3a0f-ae5e-4fd8aff50176
    keyAPPC-1310

    APPC performance testing


    Stability

    1 - project team

    2 - Integration team


    Assume

    1 - project team but we may not reach 80% code coverage

    2 - Integration team

    Assume Integration team will address Level 2 -  72 hour test in Casablanca
  • 0 – none
  • 1 – 72 hours component level soak w/random transactions
  • 2 – 72 hours platform level soak w/random transactions
  • 3 – 6 months track record of reduced defect rateDublin

    *current (1/13/19) code coverage is 67.9%

    • Level 0: none beyond release requirements
    • Level 1: 72 hour component-level soak test (random test transactions with 80% code coverage; steady load)
    Resiliency2

    2

    In Casablanca we will address Resiliency at the DB level since that was a constrain in Beijing. this will be possible with the move to Maria DB w/Galera

    • 0 – none
    • 1 – manual failure and recovery (< 30 minutes)
    • 2 – automated detection and recovery (single site)
    • 3 – automated detection and recovery (geo redundancy)
    Security1

    1?  Partial

    Level 1 definitions in Casablanca where changed.

    Unclear if we can meet Level 1 at this time based on Open Questions:

    1. How do we handle false positives and third party issues reported in NexusIQ;
      1. We will tackle Criticals first and then address mediums as time permit
    2. How do we deal with contiguously retaining no critical or high known vulnerabilities > 60 days when we are on a 6 month release cycle
    3. Addressing ALL communication has dependency on other projects, such as DMaaP, and dependency alignment does not fit schedule.
    • 0 – none
    • 1 – CII Passing badge + 50% Test Coverage
    • 2 – CII Silver badge; internal communication encrypted; role-based access control and authorization for all calls
    • 3 – CII Gold
    Scalability11
    • 0 – no ability to scale
    • 1 – single site horizontal scaling
    • 2 – geographic scaling
    • 3 – scaling across multiple ONAP instances
    Manageability1

    1

    Recommendation for Casablanca is Level 2; however, Level 2 requirements are unclear and cannot be committed to.

    • 1 – single logging system across components; instantiation in < 1 hour
    • 2 – ability to upgrade a single component; tracing across components; externalized configuration management
    Usability1

    1

    Recommendation for Casablanca is Level 2; however, we cannot meeting Level 2

    All new API’s must adhere to the ONAP API Common Versioning Strategy and Documentation Guidelines;   - There was an issue with ODL & API version - need to investigate further

    Swagger 2.0 - We dependent on what ODL Oxygen for API documentation and they dictate version of Swagger used, currently looked like v1.2

    E2E tutorial ???

    • 1 – user guide; deployment documentation; API documentation
    • 2 – UI consistency; usability testing; tutorial documentation
    • API Incoming Dependencies

    List the API this project is expecting from other projects.
    Prior to Release Planning review, Team Leads must agreed on the date by which the API will be fully defined. The API Delivery date must not be later than the release API Freeze date.

    Prior to the delivery date, it is a good practice to organize an API review with the API consumers.

    API Name

    ...

    Needs further discussion: New named query to retrieve data for ScaleOut or does APPC need to build the query??

    ...

    • API Outgoing Dependencies

    API this project is delivering to other projects.

    API Name

    ...

    Link toward the detailed API description

    https://onap.readthedocs.io/en/latest/submodules/appc.git/docs/APPC%20LCM%20API%20Guide/APPC%20LCM%20API%20Guide.htmll




    Security11, 2 (partial, please see the comments)
    there is http internal connection between CDT and APPC, we need to find the resource to migrate from http to https.
    Scalability11

    Manageability1

    1, 2(partial, please see the comments, APPC will comply two items on level 2)



    • Level 2:
      • A component can be independently upgraded without impacting operation interacting components
      • Component configuration to be externalized in a common fashion across ONAP projects
      • All application logging to adhere to ONAP Application Logging Specification v1.2
      • Implement guidelines for a minimal container footprint
    Usability1

    1




    Recommendation for Casablanca is Level 2; however, we cannot meeting Level 2

    All new API’s must adhere to the ONAP API Common Versioning Strategy and Documentation Guidelines;   - There was an issue with ODL & API version - need to investigate further

    TBD - Swagger 2.0 - We dependent on what ODL Fluorine for API documentation and they dictate version of Swagger used, currently looked like


    • API Incoming Dependencies

    List the API this project is expecting from other projects.
    Prior to Release Planning review, Team Leads must agreed on the date by which the API will be fully defined. The API Delivery date must not be later than the release API Freeze date.

    Prior to the delivery date, it is a good practice to organize an API review with the API consumers.

    API Name


    API DescriptionAPI Definition DateAPI Delivery dateAPI Definition link (i.e.swagger)
    SDCREST API

    Currently Available

    TBD
    AAIREST API

    Currently Available

    TBD
    CCSDKOpenDayLight, SLI, AAI Client, dblibEnd of MarchTBD
    DMaaPAPI  to publish/subscribe to  events sent for VNF/VM action requests.Currently AvailableTBDDMaaP API
    AAFApplication Authorization FrameworkCurrently AvailableCurrently Available


    • API Outgoing Dependencies

    API this project is delivering to other projects.

    API Name


    API DescriptionAPI Definition DateAPI Delivery dateAPI Definition link (i.e.swagger)
    NB InterfaceREST API



    Link toward the detailed API description

    APPC API Guide


    • Third Party Products Dependencies

    Third Party Products mean products that are mandatory to provide services for your components. Development of new functionality in third party product may or not be expected.
    List the Third Party Products (OpenStack, ODL, RabbitMQ, ElasticSearch,Crystal Reports, ...).

    Name


    DescriptionVersion
    ODLOpenDaylight controller platformFluorine SR2
    Docker Docker container host1.12
    MariaDB data base container

    10.1.11


    In case there are specific dependencies  (Centos 7 vs Ubuntu 16. Etc.) list them as well.

    • Testing and Integration Plans

    Provide a description of the testing activities (unit test, functional test, automation,...) that will be performed by the team within the scope of this release.

    Describe the plan to integrate and test the release deliverables within the overall ONAP system.
    Confirm that resources have been allocated to perform such activities.

    • CSIT tests added as part of R1 will continue to be supported in R3
    • Pairwise testing will be done in the WindRiver Dev lab similar to what was done in R3.
    • Epics are created to track testing activities to address Platform Maturity items.
    • Gaps

    This section is used to document a limitation on a functionality or platform support. We are currently aware of this limitation and it will be delivered in a future Release.
    List identified release gaps (if any), and its impact.

    Gaps identifiedImpact
    To fill outTo fill out
    • Known Defects and Issues

    Provide a link toward the list of all known project bugs.

    Jira Legacy
    serverSystem Jira
    columnskey,summary,type,created,updated,due,assignee,reporter,priority,status,resolution
    maximumIssues20
    jqlQueryproject = "Application Controller" AND issuetype = Bug AND affectedVersion = "Dublin Release" AND fixVersion = "Dublin Release"
    serverId4733707d-2057-3a0f-ae5e-4fd8aff50176

    • Risks

    List the risks identified for this release along with the plan to prevent the risk to occur (mitigation) and the plan of action in the case the risk would materialized (contingency).

    Risk identifiedMitigation PlanContingency Plan
    ODL upgrade to Fluorine - depends on CCSDK projects
    Fall back to Nitrogen
    • Resources

    Fill out the Resources Committed to the Release centralized page.

    • Release Milestone

    The milestones are defined at the Release Level and all the supporting project agreed to comply with these dates.

    • Team Internal Milestone

    This section is optional and may be used to document internal milestones within a project team or multiple project teams. For instance, in the case the team has made agreement with other team to deliver some artifacts on a certain date that are not in the release milestone, it is erecommended to provide these agreements and dates in this section.

    ...

    DateProjectDeliverable
    To fill outTo fill outTo fill out
    • Documentation, Training

    • Highlight the team contributions to the specific document related to he the project (Config guide, installation guide...).
    • Highlight the team contributions to the overall Release Documentation and training asset
    • High level list of documentation, training and tutorials necessary to understand the release capabilities, configuration and operation.
    • Documentation includes items such as:
      • Installation instructions
      • Configuration instructions
      • Developer guide
      • End User guide
      • Admin guide
      • ...
    Note
    titleNote

    The Documentation project will provide the Documentation Tool Chain to edit, configure, store and publish all Documentation assetAPPC will follow requirement by documentation team based on the APPC release capacities.


    Documentation updates planned for Beijing Dublin release are tracked under Documentation Epic:  APPC-993

    Jira Legacy
    serverSystem Jira
    serverId4733707d-2057-3a0f-ae5e-4fd8aff50176
    keyAPPC-1275


    Other Information

    • Vendor Neutral

    If this project is coming from an existing proprietary codebase, ensure that all proprietary trademarks, logos, product names, etc. have been removed. All ONAP deliverables must comply with this rule and be agnostic of any proprietary symbols.

    • Free and Open Source Software

    FOSS activities are critical to the delivery of the whole ONAP initiative. The information may not be fully available at Release Planning, however to avoid late refactoring, it is critical to accomplish this task as early as possible.
    List all third party Free and Open Source Software used within the release and provide License type (BSD, MIT, Apache, GNU GPL,... ).
    In the case non Apache License are found inform immediately the TSC and the Release Manager and document your reasoning on why you believe we can use a non Apache version 2 license.

    ...