Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

Test NO:TEST-03
Project:SDC
Sub ProjectResource import for SEBA
Objective:Support to import the resource for OSAM
Operator:Designer, Tester
Pre-conditions:1. Required Tosca template should be ready for SEBA

Test Step:

  1. Designer logins to SDC portal.
  2. Creates certificates(Or reuse)
  3. Creates a new VSP
  4. Imports the TOSCA template which is prepared for SEBA, to VSP
  5. Imports the VSP to Catalogs as a PNF Resource and sends for approval to a tester
  6. Tester logins to SDC portal and confirm the SEBA resource

The Result

  1. The OSAM GW SEBA resource is imported to catalog as a PNF and ready for usage at a service design level.

Observation:

We can find a new resource for SEBA in SDC catalog.

...

Test NO:TEST-04
Project:SDC
Sub Project:Design OSAM Core service
Objective:SDC support to design OSAM Core service
Pre-condition:
  1. OSAM Core resource must be cataloged as a VF

Test Step:

  1. Designer logins to SDC portal.
  2. Creates a new service from the catalog page
  3. Fill the required parameters such as category etc.
  4. Clicks composition and drags and drop the OSAM Core VF resource
  5. Saves the service and sends for testing to a testerĀ user
  6. Tester logins to ONAP and approves the service template
  7. Governer logins to ONAP and approves the service template
  8. Operator logins to ONAP and distributes the service template

Test Result:

  1. The service must be cataloged for OSAM
  2. The service must be distributed to AAI, DCAE, APPC, SDNC and SO.

Observation:

1. We can find a new service for OSAM Core catalog in SDC catalog

2. We can find a new service to instantiate in VID

...

Test NO:TEST-06
Project:SDC
Sub Project:Design SEBA service
Objective:SDC support to design SEBA service
Pre-condition:
  1. OSAM GW resource must be cataloged as a VF and must be instantiated.
  2. SEBA resource must be cataloged as a PNF

Test Step:

  1. Designer logins to SDC portal.
  2. Creates a new service from the catalog page
  3. Fill the required parameters such as category etc.
  4. Clicks composition and drags and drop the SEBA resource and the alloted resource.
  5. Enters the alloted resource configuration related to OSAM GW.
  6. Saves the service and sends for testing to a testerĀ user
  7. Tester logins to ONAP and approves the service template
  8. Governer logins to ONAP and approves the service template
  9. Operator logins to ONAP and distributes the service template

Test Result:

  1. The service must be cataloged for OSAM
  2. The service must be distributed to AAI, DCAE, APPC, SDNC and SO.

Observation:

1. We can find a new service for SEBA catalog in SDC catalog

2. We can find a new service to instantiate in VID

...

Test NO:TEST-09
Project:Service LCM
Sub-project:Service instantiation for SEBA
Objective:The Service for SEBA can be instantiated.
Pre-conditions:
  1. OSAM GW must be instantiated in any cloud region where it can able to reach SEBA pod.
  2. Subscriber must already be added.(can be from robot script...)
  3. SEBA service must be cataloged.

Test Steps:

  1. Admin enters the VID UI and selects the service
  2. Enters CorrelationId(PnfId) and location for SEBA PNF
  3. Clicks to create service.

NOTE: Test steps can be changed when VID UI is ready for PNF services.

Test Result:

  1. SEBA Service can be created successfully.

Observation:

  1. ONAP will be waiting for SEBA Pod to Register.

...

9 PNF

9.1 SEBA Registration

9.2 SEBA Activation

10 Service LCM

10.1 OSAM Core Auto Scaling

11 Data Storage

11And Activation

Test NO:TEST-10
Project:PNF
Sub-project:PNF Registration And Activation
Objective:Register And Activation of SEBA Pod to ONAP
Pre-conditions:
  1. SEBA Pod must be configured and be aware of its CorrelationId(PnfId)
  2. SEBA Pod must be aware of ONAP IP Address
  3. SEBA service must be instantiated.

Test Steps:

  1. The operator sends a rest request which contains SEBAs CorrelationId and ONAPs IP Address

Test Result:

  1. SEBA enters an active state in AAI.

Observation:

  1. SEBA Pod should be aware of OSAM GW and needs to connect.


10 Data Storage

10.1 Alarm Collection(Check the Use case tracking flow...)

Test NO:TEST-12
Project:DCAE
Sub-project:Data Collection
Objective:Use DCAE for storing alarms
Pre-conditions:
  1. SEBA service must be instantiated
  2. SEBA pod must be registered to ONAP
  3. OSAM GW must be matched with SEBA pod

Test Steps:

  1. Instantiate OSAM GW service.
  2. Instantiate SEBA service.
  3. Trigger SEBA pod to register DCAE
  4. Plug OLT to SEBA pod

Test Result:

  1. SEBA should send an event through OSAM GW to DCAE.

Observation:

  1. OSAM UI should receive an event that OLT is plugged