Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

VoLTE  Use Case Testing Screen Capture

volte E2E edited.mp4 (long version)

VoLTE Demo.mp4 (short version)

VoLTE Demo with Annotation.mp4 (short version with Chinese annotation)

SDC Desgin Video_2017-11-12_111750.wmv

UUI Instantiation Video_2017-11-12_172653.wmv

UUI_Instantiation_edited.mp4

VNF Onboarding and EPC Service Creation.mp4

EPC Service Creation.mp4


 

  1. Passed UUI performance and alarm display testing
    UUI performance and alarm display demo: UUI Performance and Alarm Display Demo.mp4


 

  1. Validate SDC-533

Meeting recording: SDC-533-validation.mp4


 

  1. VoLTE closed loop testing and demo

VoLTE closed loop demo recording: VoLTE Closed Loop Demo.mp4

VoLTE closed loop testing and debugging recording: 


 

  1. SDNC/IPWAN controller (underlay) integrated sucessfully
  2. SDNC/SPTN controller (underlay) integrated successfully
  3. SDNC/Overlay controller integration is done 50%
  4. Mobile 4G handset registration is successful through VNFs, but connection drops after a few seconds. Vendors are debugging the issue  
  5. Had a meeting with SDC team about SDC-533 issue, they will try to deliver the fix today, latest by Sunday 11/12/17


 

  1. SDNC underlay and overlay are being tested with controllers 
  2. SDC-533 issue is escalated to management


 

  1. SO/SDNC integration test passed

 

  1. DCI overlay network is manually connected now
  2. Handset and base station vendor started testing with vMME and vSPGW in CMCC lab

 

  1. Integration test of Holmes with simulated event and A&AI data
  2. Integration test of Policy with ONSET and ABATED events
  3. Integration test Policy/VFC interface. VFC received vmrestart action, but since there is network service defined in AAI, operation failed in RFC.

 

  1. Followed up on SDC-533 

 

  1. Tested EMS driver sends alarm to VES and VES sends event to Holmes through DMAAP message
  2. Tested UUI/SO interface
     

 

  1. Tested VoLTE CSARs after SDC latest change with Michael
  2. Created VoLTE e2e service in CMCC lab with the team
    Meeting recording of CSAR onboarding test: VoLTE Integration Test 10292017-1.mp4VoLTE Integration Test 10292017-1.txt
    Meeting recording of VoLTE e2e service design in CMCC: VoLTE Integration Test 10292017-2.mp4VoLTE Integration Test 10292017-2.txt

  1. Holmes integration test. Holmes received event but failed when parsing it
    Recording of Holmes integration test: VoLTE Integration Test 10282017.mp4VoLTE Integration Test 10282017.txt


  1. Tested UUI/SO interface. UUI can send service instantiation request to SO
  2. Tested simulated multiVIM alarm and sent it to VES, VES reported event to DMAAP
  3. Populated AAI data for closed loop test
    Meeting recording of UUI/SO integration test: VoLTE Integration Test 10272017-1.mp4
    Meeting recording of Holmes integration test: VoLTE Integration Test 10272017-2.mp4VoLTE Integration Test 10272017-2.txt

 

  1. Onboard all vendor CSARs (6) needed for VoLTE R1 use case test.  vTAS is not needed for VoLTE R1 use case, as is put as low priority
  2. UUI can send service instantiation request to SO
  3. VFC can parse SDC CSAR and send VL creation request to MultiVIM
    Meeting Recording of CSAR review: VoLTE Integration Test 10252017.mp4

 

  1. Onboarded 5 out 6 vendors CSAR. The remaining one needed by VoLTE use case is I/S CSCF
  2. Created
    Jira Legacy
    serverSystem Jira
    serverId4733707d-2057-3a0f-ae5e-4fd8aff50176
    keySDC-533
  3. UUI successfully populated all parameters on GUI
  4. Installed and configured Holmes in standalone mode
    Meeting Recording of CSAR review: VoLTE Integration Test 10242017.mp4
    Meeting Recording of UUI test: VoLTE Integration Test 10242017-2.mp4VoLTE Integration Test 10242017-2.txt


 

  1. Reviewed vendors CSAR
  2. Tested closed loop Policy for VoLTE use case
    Meeting Recording of CSAR review: VoLTE Integration Test 10232017-1.mp4
    Meeting Recording of Policy testing: VoLTE Integration Test 10232017-2.mp4


 

  1. Tested out new CSAR updates from vendors. They all are having issues, and feedbacks have been given to vendors 
  2. During the test found SDC ignores zip file under Artifacts directory of vendor CSAR. The zip file is used by vendor to pass info to VFC. Created 
    Jira Legacy
    serverSystem Jira
    serverId4733707d-2057-3a0f-ae5e-4fd8aff50176
    keySDC-483
     
  3. Found SDC throws error when delete a connection between two VNF resource in Service Composition GUI. 
    Jira Legacy
    serverSystem Jira
    serverId4733707d-2057-3a0f-ae5e-4fd8aff50176
    keySDC-484


    Meeting recording: VoLTE Integration Test 10192017.mp4VoLTE Integration Test 10192017.txt 

...