Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

The content of this template is expected to be fill out for M1 Release Planning Milestone.

...

Project NameEnter the name of the project
Target Release NameAmsterdam
Project Lifecycle StatePlanningIncubation
Participating Company China Mobile ,ZTE, Huawei,Nokia ,VMware,Boco,Jio,raisecom,Accenture.

Scope

What is this release trying to address?

...

Functionality Name

In or Out

Priority

Stretch

VIM Integration

IN

H

Integration with multi VIMs via Multi-VIM.

A&AI Integration

In

M

Integration with A&AI

SDC Integration

In

M

Integration with SDC

DCAE IntegrationInHIntegration with DACE to push vnf fcaps data to DACE


...


Epics

...

NS Package Management

      NS Package Onboard

      Delete NS Package

      Show NS Package

      NS package management integration with SDC

VNF Package Management

      VNF Package Onboard

      Delete VNF Package

      Show VNF Package

...

NS Deployment

      NS instantiation workflow

      NS Instantiation integration with parser

      NS Instantiation via ONAP Model

      NS Instantiation integration with SO

      NS Instantiation integration with Usecases Portal

      NS Instantiation integration with A&AI

      NS Instantiation integration with S-VNFM

      NS Instantiation integration with G-VNFM

      NS Instantiation integration with multi-VIM

NS Termination

      NS Termination workflow

      NS Termination integration with Usecases Portal

      NS Instantiation integration with SO

      NS Termination integration with A&AI

      NS Termination integration with S-VNFM

      NS Termination integration with G-VNFM

      NS Termination integration with multi-VIM

VNF Deployment

      VNF instantiation workflow

      VNF Instantiation integration with parser

      VNF Instantiation via ONAP Model

      VNF Instantiation integration with A&AI

      VNF Instantiation integration with multi-VIM

      VNF Instantiation integration with S-VNFM

      VNF Instantiation integration with VNF

      VNF Resource Granting for VNF Instantiation

VNF Termination

      VNF Termination workflow

      VNF Termination integration with A&AI

      VNF Termination integration with multi-VIM

      VNF Termination integration with S-VNFM

      VNF Resource Granting for VNF Termination

NS Autohealing

      NS Healing

      Integration with S-VNFM

      Integration with Policy

Fault

      Fault collect

      Integration with DCAE

Epics

Jira Legacy
serverSystem Jira
columnskey,summary,type,created,updated,due,assignee,reporter,priority,status,resolution
maximumIssues20
jqlQueryproject=sanbox VFC and issuetype in (epic)
serverId4733707d-2057-3a0f-ae5e-4fd8aff50176

...

Jira Legacy
serverSystem Jira
columnskey,summary,type,created,updated,due,assignee,reporter,priority,status,resolution
maximumIssues20
jqlQueryproject=sanbox VFC and issuetype in (story)
serverId4733707d-2057-3a0f-ae5e-4fd8aff50176

...

Improve NS LCM operations 

Nested NSs.

Improve VNF LCM operations

...

Indicate the outcome (Executable, Source Code, Library, API description, Tool, Documentation, Release Note...) of this release.

Deliverable Name

Deliverable Description

NS LCM

NS lifecycle management

VNF FCAPS Collection

Collect

fcaps

FCAPS data from the EMS

NS Resource Management

NS Visualize resources and instantiations resources management

VNFM Drivers

VNFM drivers, including specific VNFM drivers

VNF LCM(GVNFM)

VNF lifecycle management and init configuration management

VNF Resource Management(GVNFM)

VNF Virtual Resource Management

Sub-Components

List all sub-components part of this release.
Activities related to sub-component must be in sync with the overall release.

Sub-components are repositories are consolidate in a single centralized place. Edit the Release Components name for your project in the centralized page.

...

Anyone reading this section should have a good understanding of all the interacting modules.

Image Removed

Image Removed

The color coding is as following:

...

Image Added


API Incoming Dependencies

List the API this release is expecting from other releases.
Prior to Release Planning review, Team Leads must agreed on the date by which the API will be fully defined. The API Delivery date must not be later than the release API Freeze date.

Prior to the delivery date, it is a good practice to organize an API review with the API consumers.

...

API Name

API Description

API Definition Date

API Delivery date

API Definition link (i.e.swagger)

Catalog API (SDC)

API to read the NS and VNF Catalog




Parser API(Modeling)

API for parsering TOSCA file




Micro-services bus API

API for registration and use of micro-services bus




Multi-vim API

API to allocate resource to VIM




DCAE VES collector SB API

API to push vnf fcaps data to VES collector




A&AI API

API to store inventory




...

Name

Description

Version

WSO2

Workflow execution engine


ARIAParser

TOSCA Parser provided by modeling project

Parser

Openstack Parser ???

TBD

In case there are specific dependencies  (Centos 7 vs Ubuntu 16. Etc.) list them as well.

...

Provide a link toward the list of all known project bugs.(to be updated)

Jira Legacy
serverSystem Jira
columnskey,summary,type,created,updated,due,assignee,reporter,priority,status,resolution
maximumIssues20
jqlQueryproject=sanbox vfc and issuetype in (bug)
serverId4733707d-2057-3a0f-ae5e-4fd8aff50176

...

Risk identifiedMitigation PlanContingency Plan
To fill outTo fill outTo fill out

Resources

Fill out the Resources Committed to the Release centralized page.

Release Milestone

...

It is not expected to have a detailed project plan.

DateProjectDeliverable
To fill outTo fill outTo fill outJuly 7ModelingNSD and VNFD
July 7ModelingParser API requirements
July 21Policy/SO/Usecase portalNS/VNF LCM API

Documentation, Training

  • Highlight the team contributions to the specific document related to he project (Config guide, installation guide...).
  • Highlight the team contributions to the overall Release Documentation and training asset
  • High level list of documentation, training and tutorials necessary to understand the release capabilities, configuration and operation.
  • Documentation includes items such as:
    • Installation instructions
    • Configuration instructions
    • Developer guide
    • End User guide
    • Admin guide
    • ...

...

Each project must edit its project table available at Project FOSS.


Charter Compliance

The project team comply with the ONAP Charter.