Test lab: CMCC Lab for CL_01 - CL_04, and Winlab for CL_05 - CL_18

Summary: Except for some minor aspects on SDN-R ↔ RAN-Sim interface (most likely fix is required in RAN-Sim), all other aspects are tested.

Legend:

Status
titleNOT STARTED
 IN PROGRESS DEFERRED COMPLETED

...

Note: This includes test cases for KPI Computation (used for KPI Monitoring), Closed Loop and ML-based Closed Loop (Intelligent Slicing) features.

S. No.TopicTest Case DescriptionPriorityDependency/IssueTesterStatusRemarks
CL_01KPI Computation

Creation of suitable policies for KPI computation - formulas, PM data items, etc.

1

Status
colourGreen
titleCOMPLETED


CL_02KPI ComputationKPI computation MS fetches of relevant policies: Formulas and PM data items by KPI Computation MS1

Status
colourGreen
titleCompleted


CL_03KPI Computation

KPI Computation MS fetches PM data from DMaaP (posted by PM Mapper). Note: For this test case, we should have a simulator that sends PM data based on which PM Mapper then posts on DMaaP, alternatively, PM Mapper output should be manually posted (simulated) on DMaaP.

1
Status
colourGreen
titleCompleted



CL_04KPI Computation

KPI Computation MS computes KPIs and posts the results on DMaaP

1

Status
colourGreen
titleCOMPLETED


CL_05Closed LoopRAN-Sim sends PM data fileReadyNotification to VES-Collector for RAN PM data1To be checked

Status
colourGreen
titlecompleted


CL_06Closed LoopDataFileCollector reads the VES notification, fetches the PM xml file from RAN Simulator (SFTP) and posts in data router         1
 

    

Status
colourGreen
titlecompleted


CL_07Closed LoopPM Mapper reads the PM file from data router, generates PM events and posts in message router         1
    

 

  

 

Status
colourGreen
titlecompleted


CL_08Closed LoopSlice Analysis MS triggers Control Loop action towards Policy for throughput update at Near-RT RIC level based on analysis of DL/UL PRB used for data traffic for each S-NSSAI1
Status
colourGreen
titleCompleted



CL_09Closed LoopUpon reception of CL action from Slice Analysis MS, Policy triggers SO (RAN NSSMF) for reconfiguration of RAN resources.1To be checked

Status
colourGreen
titleCOMPLETED


CL_10Closed LoopUpon CL trigger from Policy, SO (RAN NSSMF) triggers SDN-R for updating the throughput per Near-RT RIC.1To be checked

Status
colourGreen
titleCOMPLETED


CL_11Closed LoopUpon receiving the reconfiguration trigger from SO, SDN-R sends the config updates to RAN-Sim (Near-RT RIC) successfully.1
StatuscolourYellowtitleIN PROGRESS

DEFERRED

Some minor aspects on SDN-R ↔ RAN-Sim interface needs to be fixed (most likely on RAN-Sim side). This will be done in Istanbul.
CL_12Intelligent SlicingPM data on PDU sessions requested, setup successfully and failed to setup reported by RAN-Sim (in a file) are posted on DMaaP via VES Collector1To be checked

Status
colourGreen
titlecompleted


CL_13Intelligent SlicingDataFileCollector reads the VES notification, fetches the PM xml file from RAN Simulator (SFTP) and posts in data router          1
   

Status
colourGreen
titlecompleted


CL_14Intelligent SlicingPM Mapper reads the PM file from data router, generates PM events and posts in message router          1
 

 

Status
colourGreen
titlecompleted


CL_15Intelligent SlicingSlice Analysis MS receives updates to maxNumberofConns per cell for each S-NSSAI from ML-MS (onboarded just for flow testing and demo), and triggers Policy for Control Loop action1

Status
colourGreen
titleCOMPLETED


CL_16Intelligent SlicingUpon reception of CL action from Slice Analysis MS, Policy triggers SO (RAN NSSMF) for reconfiguration of RAN resources.1

Status
colourGreen
titleCOMPLETED


CL_17Intelligent SlicingUpon CL trigger from Policy, SO (RAN NSSMF) triggers SDN-R for updating the throughput per Near-RT RIC.1To be checked

Status
colourGreen
titleCOMPLETED


CL_18Intelligent SlicingUpon receiving the reconfiguration trigger from SO, SDN-R sends the config updates to RAN-Sim (Near-RT RIC) successfully.1To be checked
StatuscolourYellowtitleIN PROGRESS

DEFERRED

Some minor aspects on SDN-R ↔ RAN-Sim interface needs to be fixed (most likely on RAN-Sim side). This will be done in Istanbul.