Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

***** Please note that the meeting Zoom bridge has been changed since May 23rd, 2023 *****

Meeting Logistics

Meeting URL QRMeeting TimeMeeting Zoom Bridge

A

Every Tuesday:

  • 14:00 UTC

  • 10AM EDT (New York)

...



Sponsor(s)/Presenter(s)

DurationTopicReferenced Docs or JIRAComments
1stN Shankar30 minsONAP 5G SON Use Case R13 Requirements

Jira Legacy
serverSystem Jira
serverId4733707d-2057-3a0f-ae5e-4fd8aff50176
keyONAPARC-786

ONAP 5G SON R13 Requirements

  • RAN-SIM enhancement: included in OOM
  • CPS enhancement - CNCF format and completion of CM update work
2nd30 minsAlign with 3gpp SA5 based on existing onap general intent model and intent interface solution

Jira Legacy
serverSystem Jira
serverId4733707d-2057-3a0f-ae5e-4fd8aff50176
keyONAPARC-787

Discussion how to align with 3gpp SA5 based on existing onap general intent model and intent interface solution
3rd30+ mins

ONAP: Streamlining - The process

ONAP - Streamlining the process-2023-7-18-v2.pptx


Jira Legacy
serverSystem Jira
serverId4733707d-2057-3a0f-ae5e-4fd8aff50176
keyONAPARC-788

ONAP: Streamlining - The process

Note: presentation slide deck is uploaded into

Jira Legacy
serverSystem Jira
serverId4733707d-2057-3a0f-ae5e-4fd8aff50176
keyONAPARC-788




Anchor
Recording
Recording

Meeting Recording

...

(Back to "Quick References")

...

Current Release Arch Review Tracking - when available

...