Besides, Holmes plans to provide a basic GUI to support simple CRUD operations.

Use Cases

Use Case: VoLTE(approved)

Minimum Viable Product

Holmes engine management component - the actual running place for Holmes rules.

...

Sub-Components

Please refer to the Resources and Repositories page.

Architecture

High level architecture diagram

...

Refering to CII Badging Security Program and Platform Maturity Requirements, fill out the table below by indicating the actual level , the targeted level for the current release and the evidences on how you plan to achieve the targeted level.

AreaActual LevelTargeted Level for current ReleaseHow, EvidencesComments
Performance01
  • To carry out performance tests to get the baseline. This baseline will be used as the start line of our improvement of the component performance.
  • 0 -- none
  • 1 – baseline performance criteria identified and measured
  • 2 & 3 – performance improvement plans created & implemented
Stability01
  • Perform long-time soaking tests within our team and fix the findings.
  • Give the data set to the integration team and ask them to help to carry out a 72 soak test in the integration lab.
  • 0 – none
  • 1 – 72 hours component level soak w/random transactions
  • 2 – 72 hours platform level soak w/random transactions
  • 3 – 6 months track record of reduced defect rate
Resiliency11
  • Holmes is a light-weighted component so the init time is less than 30 mins by nature.
  • What we are going to do is to enhance our data persistency a little bit so that after our system is down, we could recover the data along with the recovery of the component itself.
  • 0 – none
  • 1 – manual failure and recovery (< 30 minutes)
  • 2 – automated detection and recovery (single site)
  • 3 – automated detection and recovery (geo redundancy)
Security01
  • Only 2 modules' UT coverage is under 50%, but it's already above 45%. So what we gonna do is to raise the UT coverage of these 2 modules first.
  • Change all http interfaces into an https approach.
  • 0 – none
  • 1 – CII Passing badge + 50% Test Coverage
  • 2 – CII Silver badge; internal communication encrypted; role-based access control and authorization for all calls
  • 3 – CII Gold
Scalability01
  • This part of work actually could be partly designed and implementated together with the "Resiliency" requirements because they both have something to do with the data persistency and recovery.
  • Beside the data persistency and recovery, we have to design how to solve the load balancing issues.
  • 0 – no ability to scale
  • 1 – single site horizontal scaling
  • 2 – geographic scaling
  • 3 – scaling across multiple ONAP instances
Manageability01
  • Holmes has been using Log4j as its logging tool from the very beginning. What we have to do is to regularize the logging infomation a little bit in order to comply to the requirements from the Logging Enhancements Project.
  • 1 – single logging system across components; instantiation in < 1 hour
  • 2 – ability to upgrade a single component; tracing across components; externalized configuration management
Usability01
  • All documents are already. What we are going to do is to keep them updated according to the latest dev status of Holmes.
  • 1 – user guide; deployment documentation; API documentation
  • 2 – UI consistency; usability testing; tutorial documentation


API Incoming Dependencies

List the API this project is expecting from other projects.
Prior to Release Planning review, Team Leads must agreed on the date by which the API will be fully defined. The API Delivery date must not be later than the release API Freeze date.

Prior to the delivery date, it is a good practice to organize an API review with the API consumers.

API NameAPI DescriptionAPI Definition DateAPI Delivery dateAPI Definition link (i.e.swagger)
Data Movement as a Platform APIsDMaaP message sub/pub related APIs which will be used by Holmes to collect the data from and publish data to DMaaP topics.

Data Movement as a Platform Message Router 

DMaaP Message Router API

Resource QueryQuery different resource information from A&AI. All A&AI operations are implemented in the form of RESTful APIs. I'm using "Resource Query" as a general name for the APIs in case there will be too many APIs listed here.

AAI API
DCAE APIsAPIs used for service registration and discovery.

DCAE API Documentation

Service Registration/Un-registration

Service Discovery

The APIs used to register/un-register a micro-service to/from MSB .

The APIs used to discover another micro-service via MSB.



Microservice Bus API Documentation

...

API NameAPI DescriptionAPI Definition DateAPI Delivery dateAPI Definition link (i.e.swagger)
Rule CreatingThis API is intended for creating a rule in the database.

 

August, 24th, 2017Rule Management - Beijing
Rule ModifyingThis API is intended for modifying a rule in the database.

 

August, 24th, 2017Rule Management - Beijing
Rule DeletingThis API is intended for deleting a rule from the database.

 

August, 24th, 2017Rule Management - Beijing
Rule QueryThis API is intended for querying rules from the database.

 

August, 24th, 2017Rule Management - Beijing
Health CheckThis API is used by other components to check whether Holmes is working.

 

August, 24th, 2017Health Check - Beijing

Third Party Products Dependencies

...


Testing and Integration Plans

Provide a description of the testing activities (unit test, functional test, automation,...) that will be performed by the team within the scope of this release.

...

  • For unit tests, we are going to keep the line coverage of each module to be above 50% or even higher.
  • For the functional tests, because there will be few functional requirements for Holmes, we will main reuse the current auto testing scripts to promise that the basic functions of Holmes work well. As for the GUI part, we will add some new test cases onto the wiki page and attach the corresponding testing report to it. 
  • For the non-functional requirements, we will set up a set of testing env and get them tested by ourselves. Meanwhile, we'll be collaborating with the integration team to get some advice on how to get all those platform maturity requirement tested.

Gaps

This section is used to document a limitation on a functionality or platform support. We are currently aware of this limitation and it will be delivered in a future Release.
List identified release gaps (if any), and its impact.

Gaps identifiedImpact
To fill outTo fill out--

Known Defects and Issues

Provide a link toward the list of all known project bugs.

...

Risk identifiedMitigation PlanContingency Plan
To fill outTo fill outTo fill out---

Resources

Fill out the Resources Committed to the Release centralized page.

Release Milestone

...

It is not expected to have a detailed project plan.

DateProjectDeliverable
To fill outTo fill outTo fill out---

Documentation, Training

  • Highlight the team contributions to the specific document related to he project (Config guide, installation guide...).
  • Highlight the team contributions to the overall Release Documentation and training asset
  • High level list of documentation, training and tutorials necessary to understand the release capabilities, configuration and operation.
  • Documentation includes items such as:
    • Installation instructions
    • Configuration instructions
    • Developer guide
    • End User guide
    • Admin guide
    • ...
Note
titleNote

The Documentation project will provide the Documentation Tool Chain to edit, configure, store and publish all Documentation asset.


Other Information

Vendor Neutral

If this project is coming from an existing proprietary codebase, ensure that all proprietary trademarks, logos, product names, etc. have been removed. All ONAP deliverables must comply with this rule and be agnostic of any proprietary symbols.

Free and Open Source Software

FOSS activities are critical to the delivery of the whole ONAP initiative. The information may not be fully available at Release Planning, however to avoid late refactoring, it is critical to accomplish this task as early as possible.
List all third party Free and Open Source Software used within the release and provide License type (BSD, MIT, Apache, GNU GPL,... ).
In the case non Apache License are found inform immediately the TSC and the Release Manager and document your reasoning on why you believe we can use a non Apache version 2 license.

...