Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

This is the wiki for contributions/discussions related to the 5G Use Case for the ONAP Dublin Release.

TABLE OF CONTENTS

Table of Contents


5G DUBLIN USE CASE PROPOSALS

TITLEDESCRIPTIONCATEGORYWIKI
BULK PMPerformance Measurements 5G RAN Bulk Upload, Casablanca Carry-over items

Data Collection

5G FCAPS

5G - Bulk PM (Casablanca carry-over items)
PNF PRE-ONBOARDING & ONBOARDING Use Case

PNF Package delivery, Pre-onboarding and PNF Onboarding via SDC in Dublin.


PNF Support

Discovery

5G - PNF Pre-Onboarding & Onboarding
CONFIGURATION WITH NETCONFEnhancement to NETCONF support in ONAP supporting 5G and other use cases.

PNF Support

Communications

5G FCAPS

5G - Configuration with NETCONF
5G FM META DATA & 5G PM DICTIONARYSupport for handling FM Meta Data & support for PM Dictionary & PM Schema (from standards)

PNF Support

Data Collection

5G FCAPS

5G - FM Meta Data / 5G - PM Dictionary
OOF & PCIOptimization and PCI (SON) development. Casablanca Carry-over items

5G Operational

Optimization

5G - OOF and PCI (Casablanca carry-over items)
PNF Plug and PlayPNF Plug and Play support for PNF discovery, Casablanca Carry-over items, support by PRH (PNF Registration Handler)

PNF Support

(Carry Over)

Discovery

5G - PNF Plug and Play (Casablanca carry-over items)
PNF S/W UPGRADE(MOVED TO R5 EL ALTO)

PNF Software upgrade to update the software on a PNF, Casablanca Carry-over itemsNOTE: This U/C has been pushed to El Alto

PNF Support

5G FCAPS

5G - PNF SW Upgrade (Casablanca carry-over items)
NETWORK SLICINGAdvanced 5G functionality, for Network Slicing development and early steps in long-lead development.

5G Operational

Optimization

5G - Slicing

Portal Project & Database/Data Layer


USE CASES BY CATEGORY


Use CasePNF Support5G FCAPSOpera-tionalCommun-icationsDiscoverySTAGE
Bulk PM
PM, Data Collection


2
PNF Pre-Onboarding/ OnboardingXXXX


XXXX1 (start-up)
Configuration with NetConf
CM
XXXX
2 (configuration)

PM Dictionary

FM Meta Data


PM

FM




2 (configuration)
OOF PCI

XXXX

3 (operational)
PNF Plug and PlayXXXX


XXXX1 (start-up)
PNF S/W UpgradeXXXXCM


2 (configuration)
Network Slicing

XXXX

3 (operational)

...

STAGE 3 OPERATIONAL - Use Cases that deal with a PNF after Start up and Configuration.


USE CASES BY COMMITMENT & INTEGRATION LEADS

(Verified Feb x, 2019)
USE CASEIntegration LeadsLabCommitted CompaniesInterested Companies

Overall Commitment

Bulk PM

Former user (Deleted)

liam burke

(Verified Jan 28, 2019)

Wind River (WR) Lab
AT&T, Ericsson*High

PNF Pre-Onboarding/

Onboarding

VNF SDK:

Marcin Przybysz

Krzysztof Kuzmicki

SDC:

Andy Walshe

(Verified Feb 11, 2019)

WR Lab
AT&T, Huawei, Ericsson*, Nokia*High
Configuration with NetConf

Rahul Tyagi

Eric Moore

(Verified Feb 11, 2019)

WR Lab
AT&T, Ericsson*High

FM Meta Data

PM Dictionary & Schema

Marcin Przybysz

Krzysztof Kuzmicki

(Verified Feb 7, 2019)

WR Lab
AT&T, Ericsson, Nokia*High
OOF & PCI

(Name to be provided)

Lab

Rutgers

Win

WinLab


AT&T*, Wipro*, Tech MahindraHigh
PNF Plug and Play

Marcin Przybysz

Krzysztof Kuzmicki

(Verified Jan 28, 2019)

WR Lab
AT&T, Huawei, Ericsson, Nokia*High
Network Slicing

Borislav Glozman

Modeling only (no Integration)

N/A
AT&T, Amdocs*, EricssonModeling only (High)
MOVED TO R5 EL ALTOR5 El Alto
PNF Software Upgrade
Use Case Moved to R5 El AltoN/AR5 El Alto
wangyaoguangWR Lab
AT&T, Huawei*, EricssonHigh

The COMPANIES Column in the above table represents the primary companies that are involved with the Use Case. They may be involved to various degrees. It doesn't assign a "degree" of involvement or work, but rather they are involved or intend to contribute or have contributed or are working the use case actively.

...


See Also: Dublin Release Requirements

5G U/C COMMITMENTS BY PROJECT:

The following table indicates commitment by project. The impacts have been accepted and are supported by the PTL of each ONAP Platform component and corresponding Jira Tickets are in place.

...

YES means that (1) PTL INFORMED & COMMITTED - has agreed to support the changes needed for that Use Case, (2) DEVELOPMENT SUPPORT - there is development (company) support (3) JIRA TICKETS - and a Jira ticket exists. Please see the corresponding WIKI page for that Use Case to find out more details on impact, PTL support and Jira Ticket(s).

U/CSDCVIDPortSO

AAI

ESR

SDN-CAPP-C

SDNC/

CCSDK

APPCDCAEOOFPolicyCLAMP

DM

aaP

DMaaP

AAF

VNF

SDK

REQMODEL COM
OOMVIM

Pomba

Panda

CIACLIConsul
Bulk PM(star)N/AN/AN/AN/AN/AN/AYESN/AN/AN/AYESN/AN/AYESN/AN/AN/AN/AN/AN/AN/A
OnboardingYESN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AYESYESN/AN/AN/AN/AN/AN/AN/A
NetConfN/AN/AN/AYESN/AYESN/AN/AN/AN/AN/AN/A
(
N/A1
)
N/AYESN/AN/AN/AN/AN/AN/AN/A
FM PM DictYESN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AYESN/AN/AN/AN/AN/AN/AN/A
OOF PCIN/AN/AN/AN/AN/AYESN/AYESYESYESN/AN/AN/AN/AYESN/AN/AN/AN/AN/AN/AN/A
PNF PnPN/AYESYESYESYESYESN/AYESN/AN/AN/AN/AYESN/A
(2)
YESN/AN/AN/AN/AN/AN/AN/A
S/W Upg
(3)

N/A
???
N/AN/AN/AN/A
?
YES
?
N/AN/AN/AN/AN/AN/AN/AN/AN/A
?
N/AN/AN/AN/AN/AN/AN/A
SlicingYESN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AYESN/AN/AN/AN/AN/AN/A

REQ = VNF Requirements Project. The VNF-RQTS project applies to both VNFs and PNFs. A "YES" here means that there are new requirements for the vendors. (Moved to Wed 10AM)

...

(star) Stretch Goal (N/A) but if extra resources are available some changes may be made.

Note (1): This is still in discussion, solution depends on AAF. Will have to either the preferred option is to include AAF, but if the Jira is not implemented in time in R4, an alternate simplified solution will be adopted that excludes AAF from the U/C.Note (2): In Analysis now. Feb 14, 2019Two options have been investigated for NETCONF/TLS client certificate generation: 1) manually outside of ONAP 2) by AAF. For Dublin option (1) will be supported. Option (2) is a possible extension for future release.

Note (3): Most of the PNF S/W Upgrade Use Case has been descope out of R4/Dublin and pushed to R5/El Alto release. In discussion with Change Management team, nothing major in R4 can be done, but may want to update the Playbooks distribute through SDC, distribute with roll-back API. Some discussion w/ 3GPP S/W mgmt API and what has been done in Change management U/C and how to bridge the gap. NetConf support in R4 and 5G API. See the Use Case Realization call for Wed Feb 20, 2019: USE CASE REALIZATION MEETING (Notes 2019-02-20)

Unit, Functional testing, Pair-wise testing. Where should we document the test cases prior to submission and passing on to integration. 3rd party/vendor domain external controllers.


API IMPACTS SUMMARY

The following table summarizes the expected API impacts for each of the 5G Use Cases.

These are needed for the M3 R4 Milestone (Mar 14)

USE CASEAPI Impacts
Bulk PM

DMaaP DR API Updates.

See the Wiki page for details on the Data Router Changes:

5G - Bulk PM (Casablanca carry-over items)

Next Steps: Confirming API details.

Configuration with NetConf

For communication between SO and the CDS Blueprint Processor, a new API has been defined by CDS.

This U/C will use that new API to request configuration as the last step of the extended PNF workflow.

The API request and response format is defined in the following file: BlueprintProcessorData.kt

The blueprint processor allows requests to be sent using either plain HTTP with JSON or gRPC over HTTP/2. The client in SO will use the gRPC option.

This API doesn't have pre-defined actions and payloads. Instead they will be defined as part of U/C. For initial configuration (both VNF and PNF), the following actions will be used: config-assign and config-deploy. Payload format and contents have now been proposed for both actions.

OOF / PCI

API changes are needed. Config DB API, SDN-R. APIs for individual nodes record updates in Config DB. Bulk APIs for updating. API associated with SDN-C project. SON MS & Policy & OOF. Keep in sync with the corresponding Yang Model. OOF API: micro-service calls (optimization and passes data).

Freeze on API changes.

Next Steps: JSON swagger document being produced. (in progress)

PNF S/W Upgrade

Roll-back API. From SO to SDN-C (Controller). South-bound changes (captured in the Ansible Playbooks), impacting the external controller rather than the ONAP platform. Data pushed from API so south-bound APIs will have right data (in the payload).

Reusing LCM API (between SO to SDN-C) which already has the rollback in there.

The Rollback action is already specified in SDN-C. In the yang model for LCM.Yang (in CCSDK repository) file. Mandatory/generic header fields need to make them optional so that we can use them as a generic API to pass specific 5G info in the Payload. Currently Rollback function was not implemented yet (so no one is currently using this API).

Next Steps: API definition details in progress. Changing field options, and defining the payload.

USE CASES WITH NO API IMPACT
PNF Plug and Play

New API for the Update Micro-service to SO (from the pnfUpdate event trigger) from Policy for the Reregistration Story. The "user" will be the BBS Micro-service U/C.

Next Steps: Ajay in DCAE has accepted this micro-service. Final details of the new service-update API is being defined in conjunction with SO project (Seshu).

API: New field for event publishing on pnfReady topic & pnfUpdate topic enhanced with additional fields as received in pnfRegistration event (a 1-to-1 copy). Was reviewed & agreed with BBS U/C team and change made in code (continuous integration system). Mar 14, 2019

PNF Pre-onboarding / OnboardingNo API Impacts.
5G FM Meta Data 5G PM DictionaryNo API changes
Network Slicing(Modeling only) - No API Changes



USE CASE REALIZATION MEETINGS

  - USE CASE REALIZATION MEETING (Notes 2018-11-6) Ctrl-NF

...

  - USE CASE REALIZATION MEETING (Notes 2019-01-23) U/C Cross-Interactions

  - USE CASE REALIZATION MEETING (Notes 2019-01-30) U/C Cross-Interaction, Persistency

  - USE CASE REALIZATION MEETING (Notes 2019-02-06) BBS

  - USE CASE REALIZATION MEETING (Notes 2019-02-13) PNF POB/OB U/C

  - USE CASE REALIZATION MEETING (Notes 2019-02-20) PNF S/W Upgrade

  - USE CASE REALIZATION MEETING (Notes 2019-02-27) Scaling U/C

  - USE CASE REALIZATION MEETING (Notes 2019-03-06) FM Meta Data / PM Dictionary

  - USE CASE REALIZATION MEETING (Notes 2019-03-13) U/CR discussions

PREVIOUS RELEASES

Beijing Release thread for the 5G Use Case  (Parent wiki)

Casablanca Release thread for 5G Use Case (Wiki)

RELATED ITEMS (pre-Dublin)

ONAP Network Slicing - uploaded by Ben Cheung - Jan 26, 2018

Slicing in 3GPP Rel 15 - uploaded by Ulas Kozat - Mar 19, 2018

Service 2 Slice - uploaded by Ulas Kozat - Mar 22, 2018

5G Slicing and Management - TMF contribution from Jenny Huang - Apr 26, 2018

5G Slicing - Generic model-based Requirements - uploaded by Shekar Sundaramurthy - May 3, 2018

Release 15, 3GPP SA5 Overview

RELATED PROJECTS


CHILD PAGES

Child pages (Children Display)

SUPPORTING DOCUMENTS & ATTACHMENTS

Montreal Meeting -- 5G Use Case Requirements Summary for Dublin Release

...