Comment: minutes and recording updates

Bridge

[dcaegen2] Team ONAP11, TUESDAY UTC 14:30  (10.30 AM EDT)

ONAP Meeting 11 is inviting you to a scheduled Zoom meeting.

...

All attendees must set their Zoom name in First-name FAMILY-NAME (company) format

Recording:

TBADCAEWeekly_05022023_video1584560581.mp4

Attendees:

Vijay Kumar (Host)

Jack Lucas 

Tony Hansen 

Discussion Topics:


04/18/23 - No java17 upgrade done for London. DFC pilot completed, pending test. 

2023-03-21:

        java 17 updates being deferred until after London release.  Using DFC as the pilot project, but will not complete this release.

       Need to update SECCOM wiki with the changes that have been made to address vulnerabilities

2023/03/07 - Discussion deferred to next meeting to identify if any open issues. CCSDK Java17 upgrade findings documented on this wiki - Upgrading from Java 11 to Java 17

Recommended spring-web version (6.0.2) requires java17

DFC: Try 6.0.2 locally with java17 and validate. if any issues, switch to latest 5.x version for London and notify SECCOM for waiver

IT confirmed that the build nodes do support Java 17.

S.NO Time (est)

 Topics

 Requester/Assignee Notes/Links




Notes to moderator

  • Start recording
  • Participants List







DCAE/PTL resposibilities Coverage Host

Updates: TSC is planning to form a special squad or task force to manage changes to projects that lack a PTL. Chaker will take the lead of in forming the team.


Feedback from committers on DCAE London Milestone support


Responsibilities to be distributed among DCAE Committers

The TSC has been advised that there is no coverage for milestones M3 and beyond.

M4 is coming on rescheduled to 05/04/2023 -04-27;  patches  patches need to be merged by thenin DCAE, new containers released, and OOM updates for new versions need to be submitted.

05/02/2023 -  Bi-weekly scheduled meetings will conclude with 05/30/2023; next 2 meetings are primarily to facilitate any remaining London release support.  Future enhancement/feature discussion any to be scheduled on-demand (pending TSC decision on project proceeding for Montreal and beyond)




London Release PlanningHost

https://wikilf-onap.onapatlassian.orgnet/wiki/display/DW/DCAE+R12+London+M2+Release+Planning



ML-prediction Ms London delivery

Wipro team unavailable to complete remainder process for container certification and delivery

https://gerrit.onap.org/r/c/dcaegen2/services/+/127490

05/02/2023 : ML-Predcition MS will be handled as POC for London and not included in release branch. Corresponding Jira's will be updated to POC (can be mainstreamed if team later has necessity)



Review JIRA backlogHost
  • Review JIRA backlog:
    Jira Legacy
    serverSystem Jira
    columnIdsissuekey,summary,issuetype,created,updated,duedate,assignee,reporter,priority,status,resolution
    columnskey,summary,type,created,updated,due,assignee,reporter,priority,status,resolution
    maximumIssues20
    jqlQueryproject = DCAEGEN2 AND status not in (Closed) AND labels not in (relman, dcae-mod-poc) and fixVersion = "London Release"
    serverId4733707d-2057-3a0f-ae5e-4fd8aff50176


Reviewed planned container deliveries

05/02/2023 - No new updates


Review what containers will be updated/added for the London release  (See below on 

London Artifacts Tracker)

Security recommendations for DCAEDR timeout issueViresh Navalli 
  • SliceAnalysis for London


DR timeout issue

05/02/2023 - Status on  DCAEGEN2-3313 to be checked with Capgemini team.

04/18/2023 DMAAP-1875 fix ready to submit; waiting for confirmation from Henning/DT on solution.

2023-04-04: continue with plans as detailed below. The JIRA has been updated.

Jira Legacy
serverSystem Jira
serverId4733707d-2057-3a0f-ae5e-4fd8aff50176
keyDCAEGEN2-3315
moved to DMAAP

2023/03/07: Following parameters needs to be updated on DR; Fiachra Corcoran informed code updates required. 

waitForFileProcessFailureTimer = 60.000 --> 1min (former was 10min)
maxfailuretimer = 600.000 --> 10min (former was 1h)

Jira moved to DMAAP project: DMAAP-1875

OOM Chart updates
  • OOM patches for restconf and SOn-handler failing on doc error for OOM 
    • No specific action required for DCAE; Jack Lucas  will discuss this on next OOM meeting
  • KPI MS failing on gating - pending investigation
Release branching and DCAE release notes
  • Plan to do release branching during 1st week of May
  • DCAE release notes updates to be submitted next week



    Release branching and DCAE release notes


    CMPv2 support

    CMPv2 cert generation has some dependency on truststore created through AAF init container - without testing hard to claim this feature works as desired currently.

    Jack Lucas will update the documentation to reflect OOM/London plans for supporting without AAF and remove any obsolete references.



    Documentation ErrorsVijay Kumar 

    Errors/warning reported under docuementation verify jobs (e.g https://jenkins.onap.org/job/rtdv3-global-verify-master/21304/console) to be addressed to have clean/successful job - until then committers must verify impacted files manually and override jenkins failure to merge. 

    Tony Hansen will evaluate handling these errors (post M4)

    (Doc team preferred config - https://gerrit.onap.org/r/gitweb?p=doc/doc-best-practice.git;a=blob_plain;f=docs/tox.ini;h=b9d7eb44b6a83884651385f7174c7ef0d6ab948c;hb=HEAD)



    SliceAnalysis MS updates 

    Reg : https://gerrit.onap.org/r/c/dcaegen2/services/+/134057

    Couple of issues with this merge

    • Firstly it should not have been self-merged - no change must be self-merged (unless there is an exception from TSC)
    • This looks like an enhancement feature - nly bugfixes/critical issues submission can be accepted post M3
    • This change doesnt appear to address the jira scope in entirety? Where is check on requested bandwidth and provisioned bandwidth done? Noticed new class/function introduced for publish however dont see where rest of logic/invocation for this method is done?
    • Why existing topic (DCAE_CL_OUTPUT) cannot be leveraged to notify this communication (i.e instead of creating new topic)


    05/02/2023 - London release/branching will not be including this patch. Branching will be done for London excluding this patch. Any  new patches for SliceAnalysis should be considered for Montreal.














    Topics/Demos' for future meetings