Comment: dcae#8 for capturing risk with ML MS introduction

This centralized page, for all Jakarta Kohn projects, is aimed at identifying the risks as they are foreseen within the release life cycle.

A Risk that materialized becomes an Issue.

Status:

  • Identified: a risk that has been identified, but has not yet been analyzed / assessed yet 
  • Assessed: an identified risk which currently has no risk response plan 
  • Planned: an identified risk with a risk response plan
  • In-Process: a risk where the risk response is being executed 
  • Closed: a risk that occurred and is transferred to an issue or the risk was solved/avoided
  • Not occurred: a risk that was identified but that did not occur 
  • Rejected: created and kept for tracking purposes but considered not to be used yet


4
Risk IDProject Team or person identifying the riskIdentification DateRisk (Description and potential impact)Team or component impacted by the risk

Mitigation Plan

(Action to prevent the risk to materialize)


Contingency Plan - Response Plan

(Action in case of the risk materialized)

Probability of occurrence (probability of the risk materialized)

High/Medium/Low

Impact

High/Medium/Low

StatusNotesDCAE
1CPS

 

Scope creep in work item #1 (state handling) (CPS R11 Release Planning#CPS-CORE/CPS-NCMPRequirements) corresponds to a delay in other work items such as #4 (reading data (single CM handle, synchronous only)CPSBetter up front analysis of requirements and breakdown of jiras Move some tasks to future work items to ensure timely finish of work itemHighMediumIdentified
2. DCAE 

 

REQ-

438

1211  - COMPLETION OF JAVA LANGUAGE UPDATE (v8 → v11)

dcaemod-designtool & dcaemod-nifi-registry has dependency on upstream (NiFI) project which is currently on java8

DCAEContinue  versionContinue current version for Kohn and assess /plan component (MOD) retirement for London releaseExtend the Waiver/Exception filed for H Kohn releaseHighLow

Assessed

(Discuss Identified

07/11/22 - To be discussed with SEECOM on

current

waiver extension

)

23AAI

24 Jan   

Lack of resources to deliver Jakarta Kohn high bugs/issues & global requirements

REQ-1207 

REQ-439

REQ-441

Jira Legacy
serverSystem Jira
serverId4733707d-2057-3a0f-ae5e-4fd8aff50176
keyAAI-3494

Jira Legacy
serverSystem Jira
serverId4733707d-2057-3a0f-ae5e-4fd8aff50176
keyAAI-3292

AAIMake best efforts to resolve the global requirements and high issuesRaise an exception for this release and make best efforts to resolveHighLow



34AAI

24 Jan    

Janusgraph does not support Java 11

Image RemovedREQ-438 - COMPLETION OF JAVA LANGUAGE UPDATE (v8 → v11)

AAI

Not much we can do

repos affected: aai-common, aai-graphadmin, aai-resources, aai-traversal

Raise an exception for this release and hope janusgraph supports java 11 in the coming releaseHighLow



5INTEGRATIONPOLICY

25 Jan  

Lack of lab resources to run daily/weekly tests

Tests are running on the Nokia, Orange and DT labs. If there are some issues or companies plans to withdraw the project we could be out of tests results. Will be best to have lab resources on community labs to run tests on them (independent)

INTEGRATIONFind a lab to run tests on them

Use one of the gating labs or the integration lab to run tests.

Queue of the gating tests will be longer and/or the integration lab won't be available

MediumHigh5OOM

 

Lack of resources on OOM

OOMhave more committersHighHigh

  

Very limited resources are available to deliver the Policy for the 5G SON use case, see

Jira Legacy
serverSystem Jira
columnIdsissuekey,summary,issuetype,created,updated,duedate,assignee,reporter,priority,status,resolution
columnskey,summary,type,created,updated,due,assignee,reporter,priority,status,resolution
serverId4733707d-2057-3a0f-ae5e-4fd8aff50176
keyPOLICY-4108

POLICYIf the amount of work is small, we can take the work during routine maintenance activities.Use the existing policy and try to secure resources in future releases.LowMediumIdentifiedDiscussed with the 5G SON team
6OOM & Integration

 

no PTL on both projects for this releaseOOM & IntegrationAsk community for Someone to take over the PTL rolesTBDHighHighIdentified
7DCAE 

 

Due to recent changes in resource availability from Huawei India team, DCAE Kohn commitments have to be reprioritized and adjusted.DCAEMake best efforts to resolve the key requirements and high priority issuesDefer impacted features/Jira to next releaseHighMediumIdentified
8DCAE 

 

New ML MS introduction under  REQ-1215 E2E Network Slicing use case enhancements  is under risk due to pending build issues and code refactoring resolutionDCAEMake best efforts to resolve the open issues; logged LF ticket IT-24493 for troubleshotting jenkins issueProceed to merge once latest updates are verified successfully (both tox and docker execution); jenkins job error resolution can be worked in-parallel through LF ticketHighMediumIdentified