Duration | Agenda Item | Requested by | Notes / Links |
---|---|---|---|
START RECORDING | |||
ATTENDEES
NOTES
- Control Loop TOSCA poc Liam Fallon
- Created branch in CLAMP
- Hoping to use the same code in Policy, using those dependencies and adding new objects
- Database first (TOSCA in and out) and then POJOs
- Just starting up and ready to go when all folks back from annual leaves
- Gervais-Martial Ngueko question - what is the actual control loop flow that is desired at the end? Liam - will come back to that, working on the base functionality first. Michela is thinking about that.
- How will the template (flow) will go to DCAE?? Currently SDC to DCAE, would need to know if that is unchanged or not.
- https://wiki.lfnetworking.org/display/LN/2020+October+Virtual+Technical+Event+Topic+Proposals - setup a Control Loop meeting for 60 minutes Oct 13-15th
- Self-Serve Update Vijay Kumar
- MOD Nifi based updates, had some incremental enhancements are mostly done
- MOD work - refactored seed code for easier ingestion, expecting one component delivery end of this week.
- Policy model on-boarding will continue to be worked on, will not be tied to Guilin milestone
- Policy Validation Tool - Pamela Dragosh is starting work on it
- Planning on using API to validate the Policy Type in MOD - Honolulu??
- Command Line Tool for designers to validate before on-boarding into DCAE-MOD - Guilin is possible
- Will communicate with Vijay by Friday on what this may look like
- Policy Based Filtering - work almost complete, waiting for some other application work to come in before finishing. On target to finish for M4.
- Update on Integration Testsuite: dcagen2 was updated and the blueprint, not sure what other work is happening via the Integration team. Seems to be done on gitllab infrastructure.
- All - Need to plan for RC0 Pairwise testing, Christophe and Sebastien to take over from Yuriy and Marco the testing