...
1- Guilin -R7 Architecture Reviews
...
- Sponsors: Wa
- Jira
...
- Sponsors: H
- Jira
...
- Sponsors: S
- Jira
...
Housekeeping items: (including answers and comments from last week's session)
- A quick Update on ONAPDOCS for the Frankfurt-R6 Release
Architecture Doc update for the Frankfurt ReleaseNeed volunteers to update/review some section of the Architecture Document for the Frankfurt Release
- Jira REQ-# added to the tracking spreadsheet per requirement topic
- Guilin-R7 tracking spreadsheet has already been updated
- how to close out "Conditionally approved" Reviews
- Send an email to onap-arc mailing list confirming that all the open issues have been dissuaded/agreed on by the impacted area leads - Required
- schedule a follow-up review with ArchCom - Optional
- Update the ArchhCom Tracking Jira with all the links to the referenced materials - Required
- ONAPARC-# will be added to the issue link for the corresponding Requirement topic REQ-#
- See item 2 above
- ONAPDOCS update
- The Architecture View has been updated to reference to the Frankfurt RTD pages
- An updated Tracking spreadsheet is attached
- Added a separate wiki page to list the latest version, per section 5 below.
Topic 1: Guilin-R7 ArchCom Review,REQ-340, (AR-0035-R7-052020)Multi Tenancy Support - From the 06-09-2020 sessionsubstituted by Topic 1a belowSponsors: SeshuJira's ONAPARC-592, REQ-340
- Topic 1a: Guilin-R7 ArchCom Review, REQ-343, ONAP SO support Dynamic Orchestration - Approved
- Sponsors: Seshu
- Jira's: ONAPARC-602 , REQ-343
- Sponsors: Seshu
- Topic 2: Guilin-R7 ArchCom Review, DOC-608, (AR-0DOC-608036-R7-052020) - From the 06-09-2020 session - Postponed
- Sponsors: Andy Mayer
- Jira's ONAPARC-593, DOC-608
- Sponsors: Andy Mayer
- Topic 3: Guilin-R7 ArchCom Review, REQ-325, R7 MDONS Extension - Conditional Approval
- Sponsors: Raghavan Subramanian, Xin Miao
- Jira's: ONAPARC-596, REQ-325
- Sponsors: Raghavan Subramanian, Xin Miao
- Topic 4: Guilin-R7 ArchCom Review, REQ-334, (AR-0007-R7-052020) SDO Alignment - Approved
- Sponsors: Fred
- Jira's: ONAPARC-595, REQ-334
- Sponsors: Fred
- Topic 5: Guilin-R7 ArchCom Review, REQ-334, (AR-0005-R7-052020, AR-0006-R7-2020, AR-0008-R7-02020) - Deferred to 06-23-2020
- Sponsors: Fred
- Jira's: ONAPARC-594, REQ-334
- Sponsors: Fred
2-General Architecture Items
...
5 - Current Release Arch Review Tracking - when available
ONAP-arch-reviews- tracking-r7-17-Jun-2020.xlsx
Meeting Minutes and Referenced Materials
Jira Legacy | ||||||||||
---|---|---|---|---|---|---|---|---|---|---|
|
Recording:2020-0506-26 16 ArchCom Recording