Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

1- Guilin -R7 Architecture Reviews

...

  • Sponsors: Wa
  • Jira

...

  • Sponsors: H
  • Jira 

...

  • Sponsors: S
  • Jira 

...

Housekeeping items: (including answers and comments from last week's session)

  1. A quick Update on ONAPDOCS for the Frankfurt-R6 Release
  2. Architecture Doc update for the Frankfurt Release
    1. Need volunteers to update/review some section of the Architecture Document for the Frankfurt Release
  3. Jira REQ-# added to the tracking spreadsheet per requirement topic
    1. Guilin-R7 tracking spreadsheet has already been updated
  4. how to  close out "Conditionally approved" Reviews
    1. Send an email to onap-arc  mailing list confirming that all the open issues have been dissuaded/agreed on by the impacted area leads - Required
    2. schedule a follow-up review with ArchCom - Optional
    3. Update the ArchhCom Tracking Jira with all the links to the referenced materials - Required
  5. ONAPARC-# will be added to the issue link for the corresponding Requirement topic REQ-#
    1. See item 2 above
  6. ONAPDOCS update
    1. The Architecture View has been updated to reference to the Frankfurt RTD pages
  7. An updated Tracking spreadsheet is attached
    1. Added a separate wiki page to list the latest version, per section 5 below.


2-General Architecture Items

...

5 - Current Release Arch Review Tracking - when available

ONAP-arch-reviews- tracking-r7-17-Jun-2020.xlsx

Meeting Minutes and Referenced Materials

Jira Legacy
serverSystem Jira
columnskey,summary,description,status,resolution
maximumIssues20
jqlQueryproject = "ONAP Architecture Committee" AND labels = "ARC2020-06-0916"
serverId4733707d-2057-3a0f-ae5e-4fd8aff50176


Recording:2020-0506-26 16 ArchCom Recording