Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

In progress

Monitoring shift, EDT

Completed

Stability Testing is at Intel / Windriver Lab, Integration-SB-01

Starting Time: 11/21, 2018 at 5:00PM PST

...

Robot Test

(Every 60 minutes)

...

Ending Time: 11/24, 2018 at 5:00PM PST

Basic sanity testing: 78/78 Pass

Total testing 3 end to end use case and 1 closed loop: 246/288= 85.4%


More details:

windriver-sb01-oom-stability72hr-e2e-all tests.pdf

windriver-sb01-oom-stability72hr-e2e-failed tests.pdf

windriver-sb01-oom-vfwclosedloop failed.pdf

windriver-sb01-oom-vfwclosedloop all.pdf

Testsuites Test Report 3 end to end.pdf