Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

Info
titleInfo

Use the "Copy" and "Move" options (available under the ..., top right of this page) to duplicate this template into your project wiki.
Use the Wiki to document the release plan. Don't provide PowerPoint.
Use as much diagrams and flow charts as you need, directly in the wiki, to convey your message.

Table of Contents
outlinetrue

Overview

Project NameEnter the name of the project
Target Release NameCasablanca Release
Project Lifecycle StateIncubation. Refer to ONAP Charter, section 3.3 Project Lifecycle for further information
Participating Company 
AT
Amdocs, AT&T
Intel (need to confirm), Tech Mahindra, Ericsson
, China Mobile, Huawei, Intel, Nokia, Orange, Tech Mahindra, ZTE

Scope

What is this release trying to address?

The Casablanca Release will be focusing on the following areas:

  • Upgrade to Karaf 4
  • Upgrade of ODL to Oxygen (CCSDK dependency)
  • Migrate DB to use Maria DB with Galera (CCSDK dependency)
  • Platform Maturity (i.e., S3P items)
    • Resiliency
      • Level 2 - regression from Beijing, plug close gap on DB resiliency.
      • DB Resiliency was a limitation in Beijing due to the Active/Standby nature of MySQL. MariaDB w/Galera provides an active-active clustered configuration, which will support local fail-over.
    • Scalability
      • Level 1 will be a regression run on Casablanca release - anticipate this to be test only
    • Stability
      • Level 1 will be a regression run on Casablanca release - anticipate this to be test only
      • Level 2 requirement is expected to be covered by the Integration team.
    • Security
      • Level 1 definition has changed in Casablanca. Not clear we are achieve Level 1
      • Address outstanding items related to CII Passing Badge:
        • Clearing Critical and Medium Nexus IQ Security alerts to the extent possible
        • Addressing 2 other security related items from Passing Badge related to encryption
      • Secure DMaaP topics (Dependency on DMaaP project) - Stretch Goal, not currently committed for Casablanca
        • DMaaP indicated delivery would be Sept, plus
        • DMaaP story is still not written to enable APPC to assess impact at this stage.
  • Support new LCM action Reboot and various other enhancements to existing LCM actions (Tracked under Epic: APPC-899)
  • Documentation updates for Casablanca, such as, but not limited to:
    • LCM API Guide
    • Release Notes
  • Code Coverage for CDT (Javascript) - TBD, no commitment at this stage
  • Use Cases
    • ConfigScaleOut - Partially supported
      • Support Retrieval of configuration data from AAI instead of having SO pass configuration data in payload - (investigate if we can we reuse the named query)
        • Dependency on SO to pass the vf-module-id of the vDNS instance that must be added.
      • No commitment on Controller Type since requirements are still unclear.
    • Change Management - No Commitment5G/PNF - No Commitment (although APPC is listed as an impacted component, there does not appear to be any immediate requirement for Casablanca. Items noted are longer road map items)Commitment based on support from ATT resources
    • 5G/PNF

Use Cases

Describe the use case this release is targeted for (better if reference to customer use case).

The use cases supported in Beijing release will continue to be supported as part of regression assuming all other components do likewise.CCVPN

APPC SO will contribute partially to the following use cases as part of the functional requirements.

  • Scaling Use Case - 
    • APPC SO will support retrieving the data to be configured from AAI. This however has a dependency on SO to  pass the vf-module-id of the vDNS that was instantiated..
    • Discussions around how Controller Type will be handled are still too vague and unclear, so no commitment can be made to support this. APPC will continue to support APPC and SDNC via the Client Library as was done in Beijing.

Minimum Viable Product

...

  • CCVPN Use Case
    • Support the Cross Domain Cross Llink Virtual Private Network between 2 ONAP instances.
  • HPA extension for the other existing usecases
  • PNF resources orchestration 

Minimum Viable Product

Same as was defined for Beijing with the adding of CDT.

Functionalities

List the functionalities that this release is committing to deliver by providing a link to JIRA Epics and Stories. In the JIRA Priority field, specify the priority (either High, Medium, Low). The priority will be used in case de-scoping is required. Don't assign High priority to all functionalities.

Epics

Jira Legacy
serverSystem Jira
columnskey,summary,type,created,updated,due,assignee,reporter,priority,status,resolution
maximumIssues20
jqlQueryproject=appc so and issuetype in (epic) and fixVersion = "Casablanca Release"
serverId4733707d-2057-3a0f-ae5e-4fd8aff50176

Stories

Jira Legacy
serverSystem Jira
columnskey,summary,type,created,updated,due,assignee,reporter,priority,status,resolution
maximumIssues20
jqlQueryproject=appc so and issuetype in (story) and fixVersion = "Casablanca Release"
serverId4733707d-2057-3a0f-ae5e-4fd8aff50176

Longer term roadmap

The long term road map is to achieve all the goals outlined in the approved project proposal; to be fully model and standards driven, be agnostics and make no assumptions about the network. Support configuration and lifecyle management of VNF/VNFC in a generic fashion so that on-boarding any new VNF/VNFC is just a matter of configuration and data. Longer term items include:

  • Align to the controller architecture proposed as part of ONAP by the architecture team.
  • Work with SDNC team to converge on a single controller design tool
  • Support different types of clouds, currently only support Openstack;

Release Deliverables

Indicate the outcome (Executable, Source Code, Library, API description, Tool, Documentation, Release Note...) of this release.

...

Linux shell scripts and Maven pom files used to generate
Deliverable NameDeliverable DescriptionDeliverable Location
"App-c Image" Docker ContainerSO Docker ImagesExecutableDocker images image available on nexus3
Java Source CodeThe Java code for the main App-c components.appc Git repository
Deployment ScriptsMariaDB Docker ImageExecutableDocker image available on nexus3
SO LibsJar filesAvailable on nexus
Deployment ScriptsChef recipes used to configure the Docker containers. appc/deployment Git repository
Directed Graph Xml Files (DGs)Xml files define the directed graphs which are installed to database during startup and are used to determine actions taken by app-c appc/deployment Git repository
Yang Model Files Yang files are used to define the...appc Git repository
Property Files Property files are used to define values that may need to be changed depending on the environment app-c is run in.appc Git repository
CDT toolan APP-C Design Tool enabling VNF owners to create templates and other artifacts used by APP-C Configure actions (used to apply a post-instantiation configuration) as well as other life cycle commandsappc/cdt Git repository

Sub-Components

List all sub-components part of this release.
Activities related to sub-components must be in sync with the overall release.

Sub-components are repositories and are consolidated in a single centralized place. Edit the Release Components name for your project in the centralized page.

ONAP Dependencies

List the other ONAP projects you depend on.

APPC depends on the the following components as part of the general ONAP architecture:

  • SDC: Rest based interface exposed by SDC. APPC receives notifications from SDC on VNF information. SDC team provides an SDC Listener, which is used by APPC. (Currently we have no use case for this, although supported)
  • AAI: APPC retrieves and updates VNF data from/to AAI.
  • DMaaP: Message bus for communication with other components in the solution (SDC, DCAE, MSO, Portal, OOM)
  • CCSDK - APPC currently gets ODL & DB package from CCSDK; CCSDK and APPC currently must align on ODL version. 
  • AAF - AAF is used for authentication of APIs
  • MultiVIM - APPC can access Openstack via MultiVIM or CPD-PAL. MultiVIM is optional for APPC at this stage. Support of MultiVIM is limited to the Generic_Restart action

For the Casablanca release, APPC has dependencies on the following three projects for specific deliverables:

  • CCSDK - - Oxygen ODL & MariaDB plus Galera
  • SO - for scale out scenario to deliver the correct data to retrieve AAI information

Architecture

High level architecture diagram

At that stage within the Release, the team is expected to provide more Architecture details describing how the functional modules are interacting.

Indicate where your project fit within the ONAP Archiecture diagram.

Block and sequence diagrams showing relation within the project as well as relation with external components are expected.

Anyone reading this section should have a good understanding of all the interacting modules.

For details on the APPC architecture, refer to the APPC User Guide.

Image Removed

Platform Maturity

Refering to CII Badging Security Program and Platform Maturity Requirements, fill out the table below by indicating the actual level , the targeted level for the current release and the evidences on how you plan to achieve the targeted level.

...

  • 0 -- none
  • 1 – baseline performance criteria identified and measured
  • 2 & 3 – performance improvement plans created & implemented

...

1 - project team

2 - Integration team

Integration team did a 72 hour test in Beijing

...

1 - project team

2 - Integration team

...

  • 0 – none
  • 1 – 72 hours component level soak w/random transactions
  • 2 – 72 hours platform level soak w/random transactions
  • 3 – 6 months track record of reduced defect rate

...

2

In Casablanca we will address Resiliency at the DB level since that was a constrain in Beijing. this will be possible with the move to Maria DB w/Galera

...

  • 0 – none
  • 1 – manual failure and recovery (< 30 minutes)
  • 2 – automated detection and recovery (single site)
  • 3 – automated detection and recovery (geo redundancy)

...

1?

Level 1 definitions in Casablanca where changed.

...

  • 0 – none
  • 1 – CII Passing badge + 50% Test Coverage
  • 2 – CII Silver badge; internal communication encrypted; role-based access control and authorization for all calls
  • 3 – CII Gold

...

  • 0 – no ability to scale
  • 1 – single site horizontal scaling
  • 2 – geographic scaling
  • 3 – scaling across multiple ONAP instances

...

1

Recommendation for Casablanca is Level 2; however, Level 2 requirements are unclear and cannot be committed to.

...

  • 1 – single logging system across components; instantiation in < 1 hour
  • 2 – ability to upgrade a single component; tracing across components; externalized configuration management

...

1

For Level 2

All new API’s must adhere to the ONAP API Common Versioning Strategy and Documentation Guidelines;  ?? Does this apply to Reboot?

Swagger 2.0? - dependent on what Oxygen supports

E2E tutorial ???

...

  • 1 – user guide; deployment documentation; API documentation
  • 2 – UI consistency; usability testing; tutorial documentation
  • API Incoming Dependencies

List the API this project is expecting from other projects.
Prior to Release Planning review, Team Leads must agreed on the date by which the API will be fully defined. The API Delivery date must not be later than the release API Freeze date.

Prior to the delivery date, it is a good practice to organize an API review with the API consumers.

API Name

...

Currently Available

Needs further discussion: New Customer query to retrieve data for ScaleOut or does APPC need to build the query??

...

  • API Outgoing Dependencies

API this project is delivering to other projects.

API Name

...

Link toward the detailed API description

https://onap.readthedocs.io/en/latest/submodules/appc.git/docs/APPC%20LCM%20API%20Guide/APPC%20LCM%20API%20Guide.htmll

  • Third Party Products Dependencies

Third Party Products mean products that are mandatory to provide services for your components. Development of new functionality in third party product may or not be expected.
List the Third Party Products (OpenStack, ODL, RabbitMQ, ElasticSearch,Crystal Reports, ...).

Name

...

In case there are specific dependencies  (Centos 7 vs Ubuntu 16. Etc.) list them as well.

found on SO Git repositories

Sub-Components

NA

ONAP Dependencies

List the API this release is expecting from other releases. Prior to Release Planning review, Team Leads must agreed on the date by which the API will be fully defined. The API Delivery date must not be later than the release API Freeze date.

Prior to the delivery date, it is a good practice to organize an API review with the API consumers.

API Name

API Description

API Definition Date

API Delivery date

API Definition link (i.e.swagger)

SDCAPIs for distribute service modelsDefined in AmsterdamDelivered in AmsterdamInterfaces Link
A&AIAPIs for inventory dataDefined in AmsterdamDelivered in AmsterdamInterfaces Link
SDN-CAPIs for network controllerDefined in AmsterdamDelivered in AmsterdamInterfaces Link
APP-CAPIs for application controllerDefined in AmsterdamDelivered in AmsterdamInterfaces Link
VF-CAPIs for Network ServiceDefined in AmsterdamDelivered in AmsterdamInterfaces Link
Multi-VIMAPIs for Multi-VIMDefined in AmsterdamDelivered in AmsterdamInterfaces Link
OOFAPIs for placement and homingDefined in BeijingDelivered in BeijingInterfaces Link
DCAEFor PNF initialisation message from DCAE over DMaapTBDTBD

API Outgoing Dependencies

API this release is delivering to other releases.

API NameAPI Description

API Definition Date

API Delivery date

API Definition link (i.e.swagger)






Create service instanceCreate a service instanceDefined in AmsterdamDelivered in AmsterdamInterfaces Link
Delete service instanceDelete a service instanceDefined in AmsterdamDelivered in AmsterdamInterfaces Link
Create vnf instanceCreate vnf instanceDefined in AmsterdamDelivered in AmsterdamInterfaces Link
Delete vnf instanceDelete vnf instanceDefined in AmsterdamDelivered in AmsterdamInterfaces Link
Create vf module instanceCreate vf module instanceDefined in AmsterdamDelivered in AmsterdamInterfaces Link
Delete vf module instanceDelete vf module instanceDefined in AmsterdamDelivered in AmsterdamInterfaces Link
Create volume group instanceCreate volume group instanceDefined in AmsterdamDelivered in AmsterdamInterfaces Link
Delete volume group instanceDelete volume group instanceDefined in AmsterdamDelivered in AmsterdamInterfaces Link
Create network instanceCreate network instanceDefined in AmsterdamDelivered in AmsterdamInterfaces Link
Delete network instanceDelete network instanceDefined in AmsterdamDelivered in AmsterdamInterfaces Link
Get orchestration requestsGet orchestration requestsDefined in AmsterdamDelivered in AmsterdamInterfaces Link
Get a specific orchestration requestGet a specific orchestration requestDefined in AmsterdamDelivered in AmsterdamInterfaces Link
Create E2E serviceCreate E2E serviceDefined in AmsterdamDelivered in AmsterdamInterfaces Link
Delete E2E serviceDelete E2E serviceDefined in AmsterdamDelivered in AmsterdamInterfaces Link
Query progress statusQuery progress statusDefined in AmsterdamDelivered in AmsterdamInterfaces Link

Architecture

High level architecture diagram

At that stage within the Release, the team is expected to provide more Architecture details describing how the functional modules are interacting.

Indicate where your project fit within the ONAP Archiecture diagram.

Block and sequence diagrams showing relation within the project as well as relation with external components are expected.

Anyone reading this section should have a good understanding of all the interacting modules.


For details on the SO architecture, refer to the SO User Guide.


Platform Maturity

Refering to CII Badging Security Program and Platform Maturity Requirements, fill out the table below by indicating the actual level , the targeted level for the current release and the evidences on how you plan to achieve the targeted level.

AreaActual LevelTargeted Level for current ReleaseHow, EvidencesComments
Performance01
  • 0 -- none
  • 1 – baseline performance criteria identified and measured
  • 2 & 3 – performance improvement plans created & implemented
Stability

1 - project team

2 - Integration team

Integration team did a 72 hour test in Beijing

1 - project team

2 - Integration team

Assume Integration team will address Level 2 -  72 hour test in Casablanca

  • 0 – none
  • 1 – 72 hours component level soak w/random transactions
  • 2 – 72 hours platform level soak w/random transactions
  • 3 – 6 months track record of reduced defect rate
Resiliency2

2

In Casablanca we will address Resiliency at the DB level since that was a constrain in Beijing. this will be possible with the move to Maria DB w/Galera


  • 0 – none
  • 1 – manual failure and recovery (< 30 minutes)
  • 2 – automated detection and recovery (single site)
  • 3 – automated detection and recovery (geo redundancy)
Security1

1?

Level 1 definitions in Casablanca where changed.


  • 0 – none
  • 1 – CII Passing badge + 50% Test Coverage
  • 2 – CII Silver badge; internal communication encrypted; role-based access control and authorization for all calls
  • 3 – CII Gold
Scalability11
  • 0 – no ability to scale
  • 1 – single site horizontal scaling
  • 2 – geographic scaling
  • 3 – scaling across multiple ONAP instances
Manageability1

1

Recommendation for Casablanca is Level 2; however, Level 2 requirements are unclear and cannot be committed to.


  • 1 – single logging system across components; instantiation in < 1 hour
  • 2 – ability to upgrade a single component; tracing across components; externalized configuration management
Usability1

1

For Level 2

All new API’s must adhere to the ONAP API Common Versioning Strategy and Documentation Guidelines;  ?? Does this apply to Reboot?

Swagger 2.0? - dependent on what Oxygen supports

E2E tutorial ???


  • 1 – user guide; deployment documentation; API documentation
  • 2 – UI consistency; usability testing; tutorial documentation


  • Testing and Integration Plans

Provide a description of the testing activities (unit test, functional test, automation,...) that will be performed by the team within the scope of this release.

...

  • CSIT tests added as part of R1 will continue to be supported in R3
  • Pairwise testing will be done in the WindRiver Dev lab similar to what was done in R3.
  • Epics are created to track testing activities to address Platform Maturity items.
  • Gaps

This section is used to document a limitation on a functionality or platform support. We are currently aware of this limitation and it will be delivered in a future Release.
List identified release gaps (if any), and its impact.

Gaps identifiedImpact
To fill outTo fill out
  • Known Defects and Issues

Provide a link toward the list of all known project bugs.

Jira Legacy
serverSystem Jira
columnskey,summary,type,created,updated,due,assignee,reporter,priority,status,resolution
maximumIssues20
jqlQueryproject=appc and issuetype in (bug) project=so and affectedVersion = "Beijing Release" AND fixVersion = "Casablanca Release"
serverId4733707d-2057-3a0f-ae5e-4fd8aff50176

  • Risks

List the risks identified for this release along with the plan to prevent the risk to occur (mitigation) and the plan of action in the case the risk would materialized (contingency).

...

.

Risk identifiedMitigation PlanContingency Plan
Code merge from ATT Ecomp 1806started to work in a separate branch and will be merged to the main branch on basic testing completedDrop the related features and move ahead
SO dependency to delivery needed data to support the ScaleOut use case?

DMaaP support of Secure Topics?




  • Resources

Fill out the Resources Committed to the Release centralized page.

  • Release Milestone

The milestones are defined at the Release Level and all the supporting project agreed to comply with these dates.

  • Team Internal Milestone

This section is optional and may be used to document internal milestones within a project team or multiple project teams. For instance, in the case the team has made agreement with other team to deliver some artifacts on a certain date that are not in the release milestone, it is erecommended to provide these agreements and dates in this section.

...

DateProjectDeliverable
To fill outTo fill outTo fill out
  • Documentation, Training

  • Highlight the team contributions to the specific document related to he project (Config guide, installation guide...).
  • Highlight the team contributions to the overall Release Documentation and training asset
  • High level list of documentation, training and tutorials necessary to understand the release capabilities, configuration and operation.
  • Documentation includes items such as:
    • Installation instructions
    • Configuration instructions
    • Developer guide
    • End User guide
    • Admin guide
    • ...

...

Documentation updates planned for Beijing release are tracked under Documentation Epic: APPCSO-993675


Other Information

  • Vendor Neutral

If this project is coming from an existing proprietary codebase, ensure that all proprietary trademarks, logos, product names, etc. have been removed. All ONAP deliverables must comply with this rule and be agnostic of any proprietary symbols.

  • Free and Open Source Software

FOSS activities are critical to the delivery of the whole ONAP initiative. The information may not be fully available at Release Planning, however to avoid late refactoring, it is critical to accomplish this task as early as possible.
List all third party Free and Open Source Software used within the release and provide License type (BSD, MIT, Apache, GNU GPL,... ).
In the case non Apache License are found inform immediately the TSC and the Release Manager and document your reasoning on why you believe we can use a non Apache version 2 license.

...