Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

Project NameEnter the name of the project
Target Release NameEnter the name of the release you are targeting to deliverCasablanca Release
Project Lifecycle StateEither Incubation, Core, Mature. Refer to ONAP Charter, section 3.3 Project Lifecycle for further information
Participating Company List the company participating in this release. At least 3-4 organizations, including an operator are recommended.AT&T, Amdocs, Nokia

Scope

What is this release trying to address?

...

  1. S3P improvements
  2. VNF Scaling enhancements
  3. PNF support
  4. Scheduling capabilites (stretch goal)

Use Cases

Describe VID will continue supporting the use case this release is targeted for (better if reference to customer use case).

Minimum Viable Product

Describe the MVP for this release.following use case:

Use Case: Residential Broadband vCPE (Approved)

Use Case: vFW/vDNS (Approved)

Use Case: VoLTE(approved)

Use Case Proposal - VNF Scale Out

And will add support to the following:

Scaling Use Case Extension

Deployment of the hybrid 5G Network (PNF/VNF)

Change Management Extensions (best effort)

Centralized Representation and Consistent Identification of Cloud Regions In ONAP (best effort)

Minimum Viable Product

  • Instantiation of service, vnfs and vf modules
  • change management support

Functionalities

List the functionalities that this release is committing to deliver by providing a link to JIRA Epics and Stories. In the JIRA Priority field, specify the priority (either High, Medium, Low). The priority will be used in case de-scoping is required. Don't assign High priority to all functionalities.

...

Jira Legacy
serverSystem Jira
columnskey,summary,type,created,updated,due,assignee,reporter,priority,status,resolution
maximumIssues20
jqlQueryproject=sanbox VID and issuetype in (epic) and fixversion="Casablanca Release"
serverId4733707d-2057-3a0f-ae5e-4fd8aff50176

...

Jira Legacy
serverSystem Jira
columnskey,summary,type,created,updated,due,assignee,reporter,priority,status,resolution
maximumIssues20
jqlQueryproject=sanbox VID and issuetype in (story) and fixversion="Casablanca Release"
serverId4733707d-2057-3a0f-ae5e-4fd8aff50176

Longer term roadmap

...

  • Fully automated deployment of new VNFs without the need of manual intervention or configuration.
  • Support workflows for change management by using the SDC as a provider of workflows capabilities 
  • Dashboarding scheduled and ongoing change management

Release Deliverables

Indicate the outcome (Executable, Source Code, Library, API description, Tool, Documentation, Release Note...) of this release.

To fill out
Deliverable NameDeliverable DescriptionTo fill out
VID applicationExecutable, Docker
MariaDBSQL database scheme
Release documentationReadTheDocs, ONAP WIKI pages

Sub-Components

List all sub-components part of this release.
Activities related to sub-components must be in sync with the overall release.

Sub-components are repositories and are consolidated in a single centralized place. Edit the Release Components name for your project in the centralized page.

...

High level architecture diagram

At that stage within the Release, the team is expected to provide more Architecture details describing how the functional modules are interacting.

Indicate where your project fit within the ONAP Archiecture diagram.

Block and sequence diagrams showing relation within the project as well as relation with external components are expected.

Anyone reading this section should have a good understanding of all the interacting modules.VID (Dashboard OA&M) is a run-time component as appear in the diagram:

Image Added

VID dependencies diagram:

Image Added


Platform Maturity

...

AreaActual LevelTargeted Level for current ReleaseHow, EvidencesComments
Performance00
  • 0 -- none
  • 1 – baseline performance criteria identified and measured
  • 2 & 3 – performance improvement plans created & implemented
Stability12
  • 0 – none
  • 1 – 72 hours component level soak w/random transactions
  • 2 – 72 hours platform level soak w/random transactions
  • 3 – 6 months track record of reduced defect rate
Resiliency22
  • 0 – none
  • 1 – manual failure and recovery (< 30 minutes)
  • 2 – automated detection and recovery (single site)
  • 3 – automated detection and recovery (geo redundancy)
Security11

Reaching 100% for CII passing badge;

Switch to HTTPS;

Integrate with AAF

Jira Legacy
serverSystem Jira
columnskey,summary,type,status
maximumIssues20
jqlQuerykey = VID-257
serverId4733707d-2057-3a0f-ae5e-4fd8aff50176

  • 0 – none
  • 1 – CII Passing badge + 50% Test Coverage
  • 2 – CII Silver badge; internal communication encrypted; role-based access control and authorization for all calls
  • 3 – CII Gold
Scalability11
  • 0 – no ability to scale
  • 1 – single site horizontal scaling
  • 2 – geographic scaling
  • 3 – scaling across multiple ONAP instances
Manageability11(with logiing v1.2 spec support)

Jira Legacy
serverSystem Jira
columnskey,summary,type,status
maximumIssues20
jqlQuerykey = VID-253
serverId4733707d-2057-3a0f-ae5e-4fd8aff50176

  • 1 – single logging system across components; instantiation in < 1 hour
  • 2 – ability to upgrade a single component; tracing across components; externalized configuration management
Usability11

Jira Legacy
serverSystem Jira
columnskey,summary,type,status
maximumIssues20
jqlQuerykey = VID-256
serverId4733707d-2057-3a0f-ae5e-4fd8aff50176

  • 1 – user guide; deployment documentation; API documentation
  • 2 – UI consistency; usability testing; tutorial documentation

...

List the API this project is expecting from other projects.
Prior to Release Planning review, Team Leads must agreed on the date by which the API will be fully defined. The API Delivery date must not be later than the release API Freeze date.

Prior to the delivery date, it is a good practice to organize an API review with the API consumers.

API NameAPI DescriptionAPI Definition DateAPI Delivery dateAPI Definition link (i.e.swagger)To fill outHigh level description of the APIDate for which the API is reviewed and agreedTo fill out
Link toward the detailed API descriptionScale out (endpoint TBD)SO API for VNF scale outTBDTBDTBD
Service instantiation - /ecomp/mso/infra/serviceInstances/v6SO API for service instantiation with PNF supportTBDTBDTBD
  • API Outgoing Dependencies

...

API NameAPI DescriptionAPI Definition DateAPI Delivery dateAPI Definition link (i.e.swagger)
To fill outHigh level description of the APIDate for which the API is reviewed and agreedTo fill outLink toward the detailed API descriptionNANANANANA
  • Third Party Products Dependencies

Third Party Products mean products that are mandatory to provide services for your components. Development of new functionality in third party product may or not be expected.
List the Third Party Products (OpenStack, ODL, RabbitMQ, ElasticSearch,Crystal Reports, ...).

To fill out
NameDescriptionVersionTo fill outTo fill out
Docker Docker container hostLatest one
MariaDBSQL DB10.1.11

In case there are specific dependencies  (Centos 7 vs Ubuntu 16. Etc.) list them as well.

...

Describe the plan to integrate and test the release deliverables within the overall ONAP system.
Confirm that resources have been allocated to perform such activities.

  • Unit tests are run automatically as part of every code merge.
  • Once the final Docker image is compiled, it will be installed onto a Docker host and will be checked to ensure no errors occur during start-up.
  • Functional testing will occur to ensure that the use cases are functioning correctly.
  • Gaps

This section is used to document a limitation on a functionality or platform support. We are currently aware of this limitation and it will be delivered in a future Release.
List identified release gaps (if any), and its impact.

...

Jira Legacy
serverSystem Jira
columnskey,summary,type,created,updated,due,assignee,reporter,priority,status,resolution
maximumIssues20
jqlQueryproject=sanbox VID and issuetype in (bug)and fixversion="Casablanca Release"
serverId4733707d-2057-3a0f-ae5e-4fd8aff50176

...

Risk identifiedMitigation PlanContingency Plan
To fill outTo fill outTo fill out
  • Resources

Fill out the Resources Committed to the Release centralized page.

  • Release Milestone

...