- June 28, 2017 Workflow review
Chengli Wang and Lingli Deng from China Mobile presented VoLTE use case. They went through the work flow for service design, instantiation, auto healing/auto scaling and termination. 31 Participants joined the meeting and discussion. The meeting recording can be accessed here: https://zoom.us/recording/play/zClGuWa2cFq-g3YEWC-sZ74V9iJaHAx2Iw7ePKuhh1q1ttjSSFXRyoJhYxpmk8bC
Meeting minutes:
At high level, there are edge and core data centers in the use case. EPC components split between edge and core data centers. Similarly IMS components also split between edge and core. A WAN network with underlay and overlay connects the two data center.
...
Clamp: Design closed loop related policy
The Discussions in the 2nd half of the meeting discussion covered meeting covered the following topics:
EPA support is too early to decide because it’s VNF and hardware dependent, and no specific requirement is given right now. Further discussion will be held for the more requirement and lab availability.
...
More details need to be added for work flow step 1.0 in SDC, like policy input from Clamp.
...
Need to talk to OOM and MSB teams to see if we need those modules in the use case.
July 13, 2017 Meeting with CLAMP, DCAE, Policy and Holmes teams
The meeting was to clarify workflow related questions with regard to CLAMP, DCAE, Policy and Holmes projects.
1. CLAMP team needed some clarification of DCAE and Holmes relationship on VoLTE design workflow. After some discussion teams agreed that we need to separate Holmes deployment scenarios into two options. First option is Holmes is deployed as an DCAE analytics; the 2nd option is Holmes is deployed as a standalone component in ONAP. The first option is what everyone agreed to support in R1, and the 2nd option needs more discussion in a separate meeting. The VoLTE workflow will be updated for the 1st option where DCAE should be labelled as DCAE collector, and Holmes should not be in the design time. Also, configuration policy is pushed by CLAMP to Policy engine first and then Policy engine forwards the configuration policy to DCAE. Closed loop template blueprint is sent by CLAMP to SDC and SDC forwards to DCAE.
2. StringMatch policy configuration shown in CLAMP VoLTE use case is not enough to support Holmes alarm correlation rules. CLAMP team needs to know what exactly needs to be configured for VoLTE use case. Teams agreed to start with concrete event example from a single VNF failure, and CMCC team will provide an example within 2 weeks. In R1, auto healing is required and auto scaling is an aspiration goal.
3. Team discussed DCAE deployment for multiple data center scenario. Ideally, some data collection and analytics function should be run close to data source. However, due to time constraint only one instance of DCAE is supported in R1.
4. In Auto-healing and auto-scaling diagram of VoLTE use case, modification is needed to show Holmes as part of DCAE as option one Holmes deployment scenario.
5. Explained that in VoLTE use case VF-C will collect VNF events from EMS and forward to DCAE in VES format. Also, MultiVIM component will report VIM events to DCAE directly in VES format.
A followup meeting will be set up for next Thursday.
July 13, 2017 WAN Overlay Network
The meeting focused on how to build VXLAN overlay network between data centers (DCs) with EVPN protocol.
1. Discussed BGPVPN support by Openstack. VMWare and Wind River teams will go back and check if their VIMs support it. When new Intel lab is available for the community, a cross data center network can be set up to test the scenario.
2. Discussed the updated version of network diagram on wiki. Underlay network between two PEs is MPLS L3VPN; and from DC-GW to PE is VLAN. VXLAN overlay is set up between two DC-GWs by EVPN. VTEP is on DC-GW. DC-GW is controlled by SDN local controller provided by vendor.
3. Inside DC from VM to DC-GW is VXLAN, it is set up and managed by Neutron.
4. Discussed the solution that SDN local controller provides some APIs to map DC-side VXLAN with WAN-side VXLAN on DC-GW. Chengli will provide the SDN local controller APIs which CMCC used in its lab to set up VXLAN tunnel with EVPN. Based on that information, we will provide a diagram on wiki to illustrate how the VXLAN mapping is done.
5. Depend on the interface and capability of SDN local controller, we will decide in the next meeting how modules (MultiVIM, Neutron, SDN local controller, SDN WAN controller, DC-GW) work together to provide VXLAN overlay between data centers via EVPN.
July 20, 2017 DC Gateway Local Controller Interface
During the meeting, we discussed local DC gateway controller sample APIs to manage EVPN VXLAN overlay network between two data centers.
- Explained one option of how DC gateway controller interacts with DC gateway, Neutron and compute node.
- Discussed DC gateway controller sample APIs to create L2&L3 EVPN VXLAN overlay network between DCs. Other APIs to support read, update and delete EVPN VXLAN overlay network are also available. SDN-C team agreed that the APIs looked good.
- VIM team and Multi-VIM team also described other options for DC network to support VXLAN overlay. We will have further discussions of those options after R1.
The action items:
- Have a table to define the source for the parameters (import route target, export route target, networks, etc.) used in controller APIs. The source can be from vendor or SDC, etc.
- Should make decision on whether L2, L3 or L2&L3 VXLANs are required for R1.
The slides used in the meeting: volte-overlay-dist.pptx
July 28, 2017 VoLTE Use Case Status Update
We reviewed the following topics during the meeting, and the details are in the attached slides:
1) The use case current status
2) The blocking issues raised during virtual developer event, see July Virtual Developers Event Blockers
3) The next steps
4) Testing strategy for VoLTE use case. One comment was g-vnfm driver from VFC can be used as base for developing mock vnfm driver.
The slides used in the meeting: VoLTE Use Case Status Update 07-28-2017.pdf. Recording: Status update and testing strategy 07-28-2017.mp4
August 4, 2017 VoLTE TOSCA Template and Network Service Discussion
We reviewed the following topics and some details are in the attached slides:
1) Reviewed the latest SDC and SO plans to support VoLTE
2) Looked into VoLTE TOSCA template example from Open-O, with focus on Network Service template
3) Proposed an approach for Virtual Link implementation in WAN scenario
The slides used in the meeting: VoLTE TOSCA Template and Network Service.pdf
August 7, 2017 Discussion of Two Blocking Issues Raised by DCAE Team
Two issues regarding ONAP service url registration and discovery were raised by DCAE, see B26 and B27 on July Virtual Developers Event Blockers.
Through the discussion it became clear how the parameters are passed to DCAE when ONAP components are installed by HEAT as VMs. When ONAP components are deployed as containers directly by OOM through Kubernetes, further discussion is needed with OOM team.
Here is the meeting recordings: Meeting with DCAE Team on Two Blocking Issues.mp4
August 15, 2017 VoLTE Draft Test Cases Review
We reviewed the draft of VoLTE Test Cases. Here is the recording: VoLTE Draft Test Cases Review.mp4
September 6, 2017 A&AI Portal App Demo
Arul Nambi gave a demo of A&AI portal app. The new portal app visualizes the nodes and connections between nodes. The meeting recording is here: A&AI Portal App Demo.mp4
September 27, 2017 VoLTE Service Creation
David gave a demo of VoLTE Service Creation in Paris F2F conference. VoLTE Service Creation Demo.mp4