Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

An overview of the R12 London release enhancements for the SON Use Case was presented in the LFN DTF on Feb 16, 2023

LFN-DTF February 16, 2023 / Radio Access Network Function Configuration Management (CM) Update in ONAP London Release

Link: 2023-02 - ONAP: Radio Access Network Function Configuration Management (CM) Update in ONAP London Release - LF Networking - LF Networking Confluence

Slides (ppt): 20230216_LFN_DTF_Network_CM_Update.pptx

Slides (pdf): 20230216_LFN_DTF_Network_CM_Update.pdf

Recording: 20230216_LFN_DTF_Network_CM_Update_video.mp4


Figure 1 shows the overall architecture of the SON Use Case, with the London release enhancements shown in Figure 2.
For the R12 London release, the work plan is to focus on the CM Update Notification flow. 

...

Modules: RAN-Sim
Description: Generate an O-RAN O1 aligned CM update notification VES message from RAN-Sim. The objective is pursue maximum alignment with O-RAN/3GPP and to the models in ONAP and RAN-Sim.

See O1 CM Update Notification VES Message - Developer Wiki - Confluence (onap.org) for more detail.


2. Process CM VES Message

...