Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

Smart Intent Guarantee based on Closed-loop integration test

S. No

Test Case

Description

Priority

Dependency/Issue

Tester

Status

Remarks

Test Details

1

Generate PM data

Generate intelligent-slicing PM data in Ransim, store the XML files in VM and send VES notification



Status
titleNOT STARTED




2

Generate PM data

DataFileCollector reads the VES notification, fetches the PM xml file from the VM (using SFTP) and posts it in data router



Status
titleNOT STARTED



3

Generate PM data

PM Mapper reads the PM file from data router, generates PM events and posts the data in the message router(uses unauthenticated topic)



Status
titleNOT STARTED



4ML MSML MS reads the PM message from message-router(unauthenticated topic), predicts the maxNumOfConns for the cells and sends the predicted output to slice-analysis via message-router.


Status
titleNOT STARTED

Prerequisite:

  1. Data should be loaded in config DB
4

5Closed LoopSlice Analysis MS reads the message from message router(uses unauthenticated topic) and triggers Control Loop action towards Policy for maxNumOfConns update 



Status
titleNOT STARTED

Prerequisite:

  1. Data should be loaded in CPS
  2. TBDMT templates should be preloaded
5




6Closed LoopUpon reception of CL action from Slice Analysis MS, Policy triggers SO (RAN NSSMF) for reconfiguration of RAN resources.



Status
titleNOT STARTED

6


7Closed LoopUpon CL trigger from Policy, SO (RAN NSSMF) triggers SDN-R for updating the maxNumOfConns.



Status
titleNOT STARTED

7


8Closed LoopUpon receiving the reconfiguration trigger from SO, SDN-R(uses CPS to fetch relevant data) sends the config updates to RAN-Sim.



Status
titleNOT STARTED

Prerequisite:

  1. Data should be loaded in CPS
  2. TBDMT templates should be preloaded
8

9ReconfigureRAN-Sim updates DB and netconf servers.



Status
titleNOT STARTED