1. Project Overview

...

2. New component capabilities for Guilin, i.e. the functional enhancements


DCAE Focus for R7 

  • Address ONAP R7 Usecase & Functional requirement 
  • Address TSC/SECCOM MUST-HAVE non-functional requirements
  • General platform optimization 
    • DCAE Bootstrap/CM Manager optimization 
    • MOD catalog/UI redesign (POC)
    • Addressing DCAE back logs  + security fixes

Refer DCAE Guilin Scope  for more details

...

For Guilin, new MOD Front-End and Back-end components is being worked as PoC tracked under REQ-326 -Self Serve Control Loops (this would eventually replace NiFI based UI/processor in subsequent ONAP release)


Image RemovedImage Added

3. New or modified interfaces

...

PM-Mapper performance baseline

Datafile Collector (DFC) performance baseline results

HV-VES Performance Test


7. Involved use cases, architectural capabilities or functional requirements

...