...
Jira Legacy server System Jira columns key,summary,type,created,updated,due,assignee,reporter,priority,status,resolution maximumIssues 20 jqlQuery project = VVP AND issuetype = Epic AND status = Open AND fixVersion = "Guilin Release" serverId 4733707d-2057-3a0f-ae5e-4fd8aff50176
...
Tasks
Jira Legacy server System Jira columns key,summary,type,created,updated,due,assignee,reporter,priority,status,resolution maximumIssues 20 jqlQuery project in (SANDBOX, VVP) AND issuetype = Task AND fixVersion = "Guilin Release" serverId 4733707d-2057-3a0f-ae5e-4fd8aff50176
...
Sub-components are repositories and are consolidated in a single centralized place. Edit the Release Components name for your project in the centralized page.
...
Please fill out the centralized wiki page: Frankfurt Guilin Release Platform Maturity
VVP is a standalone testing tool - it is not an ONAP platform component, and the platform release maturityis not applicable.
...
Prior to Release Planning review, Team Leads must agreed on the date by which the API will be fully defined. The API Delivery date must not be later than the release API Freeze date.
Prior to the delivery date, it is a good practice to organize an API review with the API consumers.
API Name | API Description | API Definition Date | API Delivery date | API Definition link (i.e.swagger) | To fill out | High level description of the API | Date for which the API is reviewed and agreed | To fill out |
---|---|---|---|---|---|---|---|---|
Link toward the detailed API descriptionN/A | N/A | N/A | N/A | N/A |
API Outgoing Dependencies
...
API Name | API Description | API Definition Date | API Delivery date | API Definition link (i.e.swagger) | To fill out | High level description of the API | Date for which the API is reviewed and agreed | To fill out |
---|---|---|---|---|---|---|---|---|
Link toward the detailed API descriptionN/A | N/A | N/A | N/A | N/A |
Third Party Products Dependencies
...
In case there are specific dependencies (Centos 7 vs Ubuntu 16. Etc.) list them as well.
The VVP test scripts are written in python3scripts use python 3 and other opensource software. View the FOSS section for the third party software that's needed for VVP.
Testing and Integration Plans
...
This section is used to document a limitation on a functionality or platform support. We are currently aware of this limitation and it will be delivered in a future Release.
List identified release gaps (if any), and its impact.
Gaps identified | Impact | |
---|---|---|
To fill out | To fill outNone | None |
Known Defects and Issues
Please refer to Frankfurt Defect StatusNone
Risks
List the risks identified for this release along with the plan to prevent the risk to occur (mitigation) and the plan of action in the case the risk would materialized (contingency).
Please update any risk on the centralized wiki page - Frankfurt Risks
Resources
Fill out the Resources Committed to the Release centralized page.
Release Milestone
...
Please update the following centralized wiki: Frankfurt Guilin Documentation
That includes
- Team contributions to the specific document related to he project (Config guide, installation guide...).
- Team contributions to the overall Release Documentation and training asset
- High level list of documentation, training and tutorials necessary to understand the release capabilities, configuration and operation.
- Documentation includes items such as:
- Installation instructions
- Configuration instructions
- Developer guide
- End User guide
- Admin guide
- ...
...