...
- Architecture Doc update for the Frankfurt Release
- Need volunteers to update/review some section of the Architecture Document for the Frankfurt Release
- Jira REQ-# added to the tracking spreadsheet per requirement topic
- Guilin-R7 tracking spreadsheet has already been updated
- how to close out "Conditionally approved" Reviews
- Send an email to onap-arc indcatingthat arc mailing list confirming that all the open issues have been discuausseddissuaded/agreed on by the impacted area leads - Required
- schedule a follow-up review with ArchCom - Optional
- Update the ArchhCom Tracking Jira with all the links to the referenced materials - Required
- ONAPARC-# will be added to the issue link for the corresponding Requirement topic REQ-#
- See item 2 above
- ONAPDOCS update
- The Architecture View has been updated to reference to the Frankfurt RTD pages
- An updated Tracking spreadsheet is attached
- Added a separate wiki page to list the latest version, per section 5 below.
1- Guilin -R7 Architecture Reviews and Meeting Minutes
- Topic 1: Guilin-R7 AR-0012-R7-052020 - ONAP RelG Requirements - Deferred from the 06-02-2020 session (Decision pending further consultation with ArchCom)
- Sponsor: Alessandro D'Alessandro
- Jira's ONAPARC-588, REQ-392
- Topic 2: Guilin-R7 ArchCom Review (AR-0013-R7-052020) Intent-based Network - Conditional Approval - Please see comments attached to the Jira for more details
- Sponsors: WangDong, Huangzonghe & Lin Meng
- Jira's ONAPARC-589, REQ-329
- Topic 3: Guilin-R7 ArchCom Review (AR-0034-R7-052020) CCVPN- Transport Slicing - Approved
- Sponsors: Henry, Lin
- Jira's ONAPARC-590, REQ-347
- Sponsors: Henry, Lin
- Topic 4: Guilin-R7 ArchCom Review (AR-0035-R7-052020) Multi Tenancy Support - Deferred to the 06-16-2020 session
- Sponsors: Seshu
- Jira's ONAPARC-592, REQ-340
- Sponsors: Seshu
- Topic 5: Guilin-R7 (AR-0036-R7-052020) - Deferred to the 06-16-2020 session
- Sponsors: Andy Mayer
- Jira's ONAPARC-593, DOC-608
- Sponsors: Andy Mayer
...