...
Plug and Play Co-Demoing | Co-Demoing Companies: Ericsson, Nokia, CommScope Showing directly from OWL (Open Wireless Lab / 5G COSMOS) small VM without VPN Link OWL (5G COSMOS): https://cosmos-lab.org/ Size needed - 2-4 cores, 8GB of RAM, 100 GB Disk. What to Demo: Nokia would demonstrate the "basic" PnP flow (which was demonstrated a while ago) PnP PNF Onboarding Process in R5, show artifacts of an existing resource already onboard. use VID to trigger instantiation of service. Show via logs onboarded. Link to onboarding Ericsson demo: PNF PnP + NETCONF configuration (step 37) Location: Ericsson lab Demo Time Break-down: 45 min overall; 6 min overview slides "Spokesperson" Benjamin Cheung PnP w/ simulator (2 slides) 11 min per vendor (33 min): Nokia (Lead show base PnP), Ericsson (NetConf), Comscope 6 min for questions |
Bulk PM Co-Demoing | Co-Demoing Companies: Ericsson, Nokia, CommScope & NEC What to Demo: Ericsson demo: Bulk PM - fileReady event + FTP file collection Location: Ericsson lab Nokia will show Bulk PM based on FTPES server. Demo Time Break-down: 55 min Overall 6 min overview slides "Spokesperson" Oskar Malm 14.33 min per vendor (43 min) Ericsson (Lead) & Nokia, NEC 6 min for questions |
Basic Config Basic Fault | Co-Demoing Companies: What to Demo: Basic Fault/Basic Config Equipment vendors supporting O1 already support VES for FM data. Basic config 4 vendor support early version of O1 CM can say "support NetConf Yang" show config from controller. Ericsson demo: No separate configuration or fault demo. Configuration is included in the PNF PnP demo. Demo Time Break-down: 20 min |
OOF SON PCI | Co-Demoing Companies: AT&T, TBD What to Demo: (No Demo in this Plugfest) Show simplified version of OOF PCI w/ Comscope 1 cell. w/ R2 ONAP. Only used RAN simulator to now. Sending NC to Comscope will take development. Demo Time Break-down: |
WG4 Demo | Co-Demoing Companies: Samsung What to Demo: WG4 would show basic config/fault Open-FH M-Plane style. Changing a value of a config setting on radio (RU), generate an alarm (receiving the fault) Demo Time Break-down: 10 minutes |
Time & Planning | Rutgers (OWL) 18 min PnP > 45 min 22 min Bulk PM > 55 min (Mention) Basic Fault/Basic Config → (20 Min) 20min OOF SON > 20 min → 0 min (no Demo) 10min WG4 Open FH M-Plane > 10 min 20min buffer time, next steps, wrap-up, director of WINLAB > 20 min Each vendor should do Pre-recording (showing their full demo) as fall-backs. Trial Runs. Thu Dec 5 10AM-11:30AM EDT / Live. Rutgers WINLAB. Brunswick NJ Demo, Discussion in Morning. Panel in Afternoon. Demos would in Vendor Labs or in OWL. WINLAB. Director of WINLAB at the end. |
Demos in Parallel? Time Concern | Would it be possible to Demo in Parallel? Would that be possible? WebEx. Run Parallel webEx Recordings. Worthwhile, if it can be done smoothly. Time Concern. 9:00 - 11:30 instead (2.5 hours 150min) of 10-11:30 or 2-days instead of 1 day. |
Panel Discussion | Auditorium in AT&T Middletown NJ, Thursday Afternoon 2-4 PM Videotaping. Widow display/Talking heads. Talking remotely. Video of demo. Questions posed by a moderator. Each representative from equipment vendors will get to answer. Local svc providers/operators. 3-4 questions > vendors (agree upon questions) operators 3-4 questions want moderator to ask. Who is moderator - Lindon Ong. (will ask if he can host). |
Getting Access to the Labs | How to get Access to the Labs |
https://wiki.o-ran-sc.org/x/egBv Sophie Antipolis I believe is the town in France. I will look it up. | |
WINLAB | http://www.winlab.rutgers.edu/ DIRECTIONS: http://www.winlab.rutgers.edu/about/Directions.html |
SUPPORTING DOCUMENTATION
Document | File | ||||||
---|---|---|---|---|---|---|---|
ONAP ORAN Plug Slides Latest version Nov 13, 2019 |
| ||||||
Plugfest Plug and Play Slides |
| ||||||
Bulk PM | |||||||
Rutgers WIN LAB |
|
RECORDING
Recording | FILE | ||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Zoom Video & Audio (MP4) |
| ||||||||||||
Audio Only (M4A) |
| ||||||||||||
Playback (M3U) |
| ||||||||||||
Chat (Txt) |
|
...