Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

5G RAN physical/logical topology information (SDN-R) Core & RAN elements. 5G Configuration, provisioning of a 5G Network. SDN-R should contain the 5G Network Topology. CM Audit. CM Mediation. CM run-time storage / data persistency (MariaDB)

BUSINESS DRIVER

This section describes Business Drivers needs.

...

The REQ (requirements) epic for this Use Case is isĀ 

Jira Legacy
serverSystem Jira
columnskey,summary,type,created,updated,due,assignee,reporter,priority,status,resolution
serverId4733707d-2057-3a0f-ae5e-4fd8aff50176
keyREQ-133267

PROJECTPTLUser Story / EpicRequirement
A&AIEpic #1: Base RunTime DB Development

E1: A&AI Provides initial physical inventory info to ConfigDB


AAF

APPC


CLAMP

CC-SDK (Controller)
Epic #1: Base RunTime DB DevelopmentE1a. Provide RunTime DB yang model to RunTime DB.
DCAEEpic #1: Base RunTime DB Development

E1a. VES/DCAE pathway to provide configuration notification RunTime DB

E1b. VES Event Listener Document to be updated.

E1c. New VES Event domain (CM Notify) to be introduced (DCAE VES Listener)

Jira Legacy
serverSystem Jira
columnskey,summary,type,created,updated,due,assignee,reporter,priority,status,resolution
serverId4733707d-2057-3a0f-ae5e-4fd8aff50176
keyDCAEGEN2-1769

DMaaPEpic #1: Base RunTime DB DevelopmentE1a. VES/DCAE pathway to provide configuration notification RunTime DB
External API

MODELINGEpic #1: Base RunTime DB DevelopmentE1a. Design-Time modeling; Platform ONAP Model for RunTime DB to build initial structure. Use of onboarded Yang model (in vendor PNF package).

Multi-VIM /

Cloud



OOFShankaranarayanan Puzhavakath Narayanan

POLICY



PORTAL

ControllerEpic #1: Base RunTime DB Development

SDN-R and Controller Impact

E1a. Provide RunTime DB yang model to RunTime DB.

E1a. SO + Controller pathway BACK to the PNF through Netconf to update RunTime DB.

SDC

SO

VID


VNFRQTS

VNF-SDK

CDS

...