...
PROJECT | PTL | User Story / Epic | Requirement |
A&AI | Epic #1: Base RunTime DB Development | E1: A&AI Provides initial physical inventory info to ConfigDB | |
AAF | |||
APPC | |||
CLAMP | |||
CC-SDK (Controller) | Epic #1: Base RunTime DB Development | E1a. Provide RunTime DB yang model to RunTime DB. | |
DCAE | Epic #1: Base RunTime DB Development | E1a. VES/DCAE pathway to provide configuration notification RunTime DB E1b. VES Event Listener Document to be updated. E1c. New VES Event domain (CM Notify) to be introduced (DCAE VES Listener) | |
DMaaP | Epic #1: Base RunTime DB Development | E1a. VES/DCAE pathway to provide configuration notification RunTime DB | |
External API | |||
MODELING | Epic #1: Base RunTime DB Development | E1a. Design-Time modeling; Platform ONAP Model for RunTime DB to build initial structure. Use of onboarded Yang model (in vendor PNF package). | |
Multi-VIM / Cloud | |||
OOF | Shankaranarayanan Puzhavakath Narayanan | ||
POLICY | |||
PORTAL | |||
Controller | Epic #1: Base RunTime DB Development SDN-R and Controller Impact | E1a. Provide RunTime DB yang model to RunTime DB. E1a. SO + Controller pathway BACK to the PNF through Netconf to update RunTime DB. | |
SDC | |||
SO | |||
VID | Epic #2: Display | Display of RunTime DB information; Design Time view of Run Time DB info Need to discuss w/ Ittay | |
VNFRQTS | |||
VNF-SDK | |||
CDS |
...