Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

RefBlocking?StatusComponentDescription/Notes
1
OpenAll

Communication to register DR Node & BC

DR node reg with BC client? - Hook is in place, values need to pass still to be determined

post install hooks, flag can be added to keep alive (if post install jobs are completed they are deleted, flag is to allow them to not be deleted)

04/24: potentially call meeting next week with Jack Lucas, when we have resolved RC0 issues

05/01: Demo done at DCAE meeting - link to be added

Jack is currently on holidays (return date - 5/5) , can we use same logic as demoed?

Wednesday meeting(5/8) to discuss this in greater detail?

5/8: Meeting with Jack postponed to 5/15

5/13: Jack not available on 5/15. Dom to meet with Jack on 5/14 to have initial discussion.

Reference wiki page: DMaaP Edge Deployment

5/15: Dom spoke with Jack. wiki page above updated. Review today.

5/22: Jira tickets for El Alto already created. Need little bit redesign and more discussion with the OOM team.

5/29: Continuation with POC.

6/5: Mike Elliott will be scheduling a meeting to further discuss. Fiachra trying core-dns plugin with rke.

6/19: had meeting with MIke Elliot before DDF. Not much progress.. reviewed what's in progress.

07/17: OOM plan to finalise decision on Ingress controller soon.

Jira Legacy
serverSystem Jira
serverId4733707d-2057-3a0f-ae5e-4fd8aff50176
keyOOM-1993

Likely they are going with Istio + nginx Ingress Controller.

This should allow Service Mesh config https://itnext.io/istio-service-mesh-the-step-by-step-guide-adf6da18bb9a which will potentially help with multi-(site/cluster) deployment.

08/07: Jira for Ingress Controller testing created -

Jira Legacy
serverSystem Jira
serverId4733707d-2057-3a0f-ae5e-4fd8aff50176
keyAAF-935


2
ClosedAll

Global jjb vs nexus staging for El Alto - more details to follow

PTL 2019-04-29

5/01: Need to discuss for El Alto

reference wiki page: global-jjb Migration Tracker

05/13: Mandar to find if more documentation is available.

05/22: Checked with Jess. She mentioned at the moment only projects with no other dependencies are being handled. Since DMaaP has dependency on AAF, AAF has to be done first. We can start working on this once Dublin is released.

5/25: Mandar to check with Jessica if this can be kicked off.

7/10: all projects updated and issues resolved for master branch. Next step to cherry pick to Dublin branch and validate.

7/24: Closing this. Dublin branch to be updated only if required.

3
ClosedAllIs there any indication from the PTL Meeting as to the expected Badging requirement for El Alto? Most specifically the potentially time consuming activities like:

The project MUST have FLOSS automated test suite(s) that provide at least 80% statement coverage if there is at least one FLOSS tool that can measure this criterion in the selected language.


Also for confusion on specific questions is there a procedure to request some clarity? Some are discussed on the SECCOM discuss list

07/31: Mandar conformed 55% test coverage is sufficient for silver badge

4
OpenClosedAll

07/17: DMaaP charts move out of OOM into DMaaP projects. Mandar to send note to Mike Elliott to see if this can be initiated.

  • Plan is to implement more common templates for deployment
    Jira Legacy
    serverSystem Jira
    serverId4733707d-2057-3a0f-ae5e-4fd8aff50176
    keyOOM-1971
    , then update the component charts before migrating the ownership to avoid inconsistency.
  • Also proposed that we could assist in this once the new templates are added.

08/07: Jira created with OOM blocking tasks -

Jira Legacy
serverSystem Jira
serverId4733707d-2057-3a0f-ae5e-4fd8aff50176
keyDMAAP-1267
to track the above.

5
OpenAll

07/17: OOM are proposing a global AAF flag

Jira Legacy
serverSystem Jira
serverId4733707d-2057-3a0f-ae5e-4fd8aff50176
keyOOM-1986
which we discussed previously. Will potentially need to align existing patch with their proposal.

...