...
- PNFD and VNFD have been mapped to platform data/information model.
- SDC contains the verified service and resource descriptors
- Associated resources (PNF, VNF, ANF) used by services have been properly onboarded.
- Services have been defined in design time, and associated templates, control loops, blueprints have been incorporated into the service
- SDC has composed the Service Design CSAR package ready for distribution.
- The Certification Studio has certified the Package ready for distribution
- The Deployment Studio operator has identified the Service Design CSAR package for distribution
3. Information Flow
Figure: Service CSAR Distribution-1
SUBSCRIBING – SO, DCAE, A&AI, SDN-C, APP-C, VF-C have subscribed to the SDC Artifact distribution
CSAR DISTRIBUTION to SO – SDC Distributes to SO using the SDCE-6 interface. SO listener retrieves the SDC CSAR package. SDC distributes the Service Distribution CSAR package which includes all of the artifacts, templates and resources related to the service created in design time. SDC publishes a topic onto DMaaP. Any RT component that has subscribed to that topic can get that package.
4. Post Condition
The post-conditions are:
...