Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

Table of Contents
outlinetrue

Overview

...


Use Case

Lab

Responsible

EPIC

1vFW / vDNS

Intel / Windriver


2

vCPE Integration Test Case

Intel / Windriver


3

vCPE with TOSCA VNF Test Case

CMCC


4

5G - Real Time PM and High Volume Stream Data Collection - Integration Test Status

TLab


5

5G - PNF PnP - Integration Test Status

TLab
6

5G - Bulk PM - Test Status

Intel / Windriver


7

5G - OOF and PCI - Integration Test Cases

Intel / Windriver





8

Scale Out - Integration Test Cases and Status

Intel / Windriver


9CCVPN Integration Test CasesCMCC


10

vFW/vDNS HPA Regression and Enhancement Testing

(HPA & Cloud Agnostic Intent - R3 Test Plan)

Intel / Windriver


11Change Management - Flexible Designer & OrchestratorIntel / Windriver



12Change Management - Traffic Management-Intel / Windriver



13

Change Management - 5G PNF in-place software upgrade

Intel / Windriver



14Change Management - Schedule optimizationIntel / Windriver


15BBSSwisscom, CMCC, Huawei, Nokia
165G Slicing (scope is not clear, need to wait for TSC requirement)AT&T, Nokia, Ericsson
17vFW on ARM (no integration commitment, vendor will cover all tests)ARM, ENEA
18Model driven control loop designAT&T, NokiaTesting confirmed by AT&T
19K8S based cloud region supportIntel, VMWareTesting confirmed by Intel
20Distributed Analytics as a Service (Dublin Summary) - Edge AutomationVMWare, IntelTesting confirmed by Intel
21Consistent ID of a Cloud Region Windriver, AT&T, CMCCNeed to talk to Bin Yang about testing resource

...

Area

Actual Level

Targeted Level for current Release

How, Evidences

Comments

ManageabilityNot Measured1, partial of 2
  • 1 – single logging system across components; instantiation in < 1 hour
  • 2 – ability to upgrade a single component; tracing across components; externalized configuration management
PerformanceNot MeasuredNot Measured
  • 0 -- none
  • 1 – baseline performance criteria identified and measured
  • 2 & 3 – performance improvement plans created & implemented
Resiliency23

Will cover geo-redundancy if lab env supports it.

All Integration team will perform platform-level testing similar to:

Beijing Release Resiliency Testing Status

  • 0 – none
  • 1 – manual failure and recovery (< 30 minutes)
  • 2 – automated detection and recovery (single site)
  • 3 – automated detection and recovery (geo redundancy)
ScalabilityNot MeasuredNote Measured
  • 0 – no ability to scale
  • 1 – single site horizontal scaling
  • 2 – geographic scaling
  • 3 – scaling across multiple ONAP instances
SecurityNot MeasuredNot Measured
  • 0 – none
  • 1 – CII Passing badge + 50% Test Coverage
  • 2 – CII Silver badge; internal communication encrypted; role-based access control and authorization for all calls
  • 3 – CII Gold
Stability22

Integration team will perform platform-level testing similar to:

Beijing Release Stability Testing Status (w/ OOM)

Beijing Release Stability Testing Status (w/ HEAT)

  • 0 – none
  • 1 – 72 hours component level soak w/random transactions
  • 2 – 72 hours platform level soak w/random transactions
  • 3 – 6 months track record of reduced defect rate
UsabilityNot MeasuredNot Measured
  • 1 – user guide; deployment documentation; API documentation
  • 2 – UI consistency; usability testing; tutorial documentation

...