Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

LoggingLogging
Target Release NameDublin
Project Lifecycle StateMature. Refer to ONAP Charter, section 3.3 Project Lifecycle for further information
Participating Company Amdocs, AT&T, Bell

Scope

What is this release trying to address?

...

Area

Actual Level

log/pomba

Targeted Level for current ReleaseHow, EvidencesComments
Performance2/22/2via k8s
  • 0 -- none
  • 1 – baseline performance criteria identified and measured
  • 2 & 3 – performance improvement plans created & implemented
Stability2/23/3via k8s
  • 0 – none
  • 1 – 72 hours component level soak w/random transactions
  • 2 – 72 hours platform level soak w/random transactions
  • 3 – 6 months track record of reduced defect rate
Resiliency2/22/2via k8s
  • 0 – none
  • 1 – manual failure and recovery (< 30 minutes)
  • 2 – automated detection and recovery (single site)
  • 3 – automated detection and recovery (geo redundancy)
Security0/11/1with AAF
  • 0 – none
  • 1 – CII Passing badge + 50% Test Coverage
  • 2 – CII Silver badge; internal communication encrypted; role-based access control and authorization for all calls
  • 3 – CII Gold
Scalability1/11/1via k8s
  • 0 – no ability to scale
  • 1 – single site horizontal scaling
  • 2 – geographic scaling
  • 3 – scaling across multiple ONAP instances
Manageability1/11/1via k8s
  • 1 – single logging system across components; instantiation in < 1 hour
  • 2 – ability to upgrade a single component; tracing across components; externalized configuration management
Usability1/11/1
  • 1 – user guide; deployment documentation; API documentation
  • 2 – UI consistency; usability testing; tutorial documentation

...