Analysis content
...
Options to fix the above issues
|
|
Option 1 | Fix A and B (including B1 and B2) in Dublin release |
---|
Option2 | Fix all the issues (A, B, C and D) in Dublin release |
Option3 | Keep it without any fix, and only correct them when designing the new target internal DM (TIDM): - The rules for designing TIDM have to be considered and decided in Dublin release, e.g.,
Issue A and B1 have to be avoid B2 should align with the SOL001 spec C should be obsoleted and replaced by TIDM or other on-boarding DM (e.g. SOL001) D should be obsoleted and replaced by TIDM or other on-boarding DM (e.g. SOL001) Other rules? - Provide guidance and suggestion for the related projects about using which TOSCA parser (SDC TOSCA Parser or NFV Parser).
|
R3 CSAR which exported by SDC in CCVPN use case and CPE use caseĀ
...