Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

Casablanca VNF Life Cycle Operations are primarily related to operations from SDNC/APPC:

Requirement ONAP Command
R-328086DistributeTraffic
R-12706QuiesceTraffic
R-07251ResumeTraffic
R-83146StopApplication
R-82811StartApplication 
R-19922UpgradePrecheck
R-49466UpgradeSoftware 
R-45856UpgradePostCheck
R-97343UpgradeBackup
R-65641UpgradeBackOut
R-41430HealthCheck
R-20741Configure
R-19366ConfigModify
R-32981ConfigBackup
R-48247ConfigRestore
R-94084ConfigScaleOut
R-56385Audit


Dublin Architecture discussion propose increasing  alignment with ETSI NFV ISG specifications. ETSI NFV ISG SOL 003 proposes a different set of Life cycle operations ( from the NFVO to the VNFM) in ONAP architecture terms these would be towards the VFC, but presumably comparable operations would then flow down to the VNF. These operations are:

  • Create VNF Identifier
  • Query VNF
  • Modify VNF Information
  • Delete VNF Identifier
  • Instantiate VNF
  • Scale VNF
  • Scale VNF to Level
  • Change VNF Flavour
  • Terminate VNF
  • Heal VNF
  • Operate VNF
  • Change external VNF connectivity
  • Get Operation Status
  • Subscribe
  • Query Subscription Information
  • Terminate Subscription
  • Notify

Requirements for VNF behaviors corresponding to these commands are not available in the Casablanca release.