...
- M3 Due 8/23/18 finalize :
Portal-343 Sireesh will check in today or tomorrow - donePortal-314 is closedPortal-275 check to see if postponed to Dublin - Lorraine check today - yes moved to DublinPortal- 288 code is done, documentation needs to be updatedand sdk-2.4.0 code to be tested - Sunder ??Portal-362 Lorraine submitted, Sunder to merge - done
- M4 pending items:
- Portal-247 Sonar scan Hari - Leimeng send him an email in-progress- notified to hold on to the sonar scan fixes - there are open commits - Sunder reviewed some - inprogress
- Portal-272 Sireesh will change status - adding more test cases: for Language, SDK, etc
- Portal-316 and Portal-314 turn on Raptor Reports on VM 11 menu for SDK - Leimeng,; menu in gerrit has to be activated if it passes ; Portal-314 is closed
- Portal-275 check to see if postponed to Dublin - Lorraine check today
- Portal- 288 code is done, documentation needs to be updated and code to be tested - Sunder ??
- Portal-362 Lorraine submitted, Sunder to merge - done- Sunder to deploy latest sdk in vm11 (update the docker version to staging) - inprogress
- Code Coverage needs to be maintained at 50% or the current coverage better than 50%. (70% on Portal, on 64% SDK) - check offline
- SDK repo - Naveen is working on new SDK code coverage changes. New SDK commits made - Please add more reviewers - "Amrita Kundu" <amrkundu@in.ibm.com> and Mani are working part time on the code coverage
- Prasad/Swapnali - not active on the code commits.
- Please use Epic - PORTAL-268 - for code coverage - PORTAL-273; for sonar issues - PORTAL-247; (focused on Portal repo).
- Design for Angular update
Source code to be committed for Angular upgrade in a separate folder under SDK (waiting on fixing the build process which is taking long)- gerrit review is done - waiting to merge.- update the xml file - Saravanan.- still reviewing, pending
- Bump up the pom and docker versions to snapshots and deploy to T-Lab and Windriver (change in OOM as needed) - Saravanan/Sunder/Manoop.
- fonts and icons abstraction so that they can be switched with a flag configuration - Saravanan (decided to achieve this configuration during the build rather than at runtime)
- One screen implementation needs review with Sunder. - complete , will meet before checking the code
- Lorraine to run grep scan for ecomp keyword - done - Review with Sunder/Manoop - will send them result in email - forward scan email to Hima and Lorraine
- Look for the vm host names in the files - to clean up - Lorraine already made commit for this changes - Hima can help if requires java file changes.
ECOMP to ONAP word changes in license text - done in Code Cloud - waiting to move to Gerrit - 08/01- Need to review the MUSIC related classes to cleanup the ECOMP keywords - Hima looking into it. (changes are being committed in internal codecloud, soon will be pushed to gerrit).
- Hima working through changes - still working on it , Lorraine will help
- Moving the current CSIT tests to test-suites repo -
may need to create a new JIRA item to track- Sireesh/Ritesh -Jira Legacy server System Jira serverId 4733707d-2057-3a0f-ae5e-4fd8aff50176 key PORTAL-343 - Submit the changes into test-suites and add reviewers - Brian Freeman and Gary Wu - ETA 08/13 - done
- Reviews being done and Sireesh fixing the files. - done
- Once merged, please request Gary to trigger portal scripts from External labs OOM jenkins jobs - Sireesh. - working with Gary
- Runs from local, needs to be tested in Jenkins
- Sireesh/Ritesh to plan the test cases for the new features planned to Casablanca - Portal R3 Casablanca Functional Test Cases
- Regarding reporting feature - there is meeting scheduled for Friday. - meeting was held, some test cases are written
- Regarding language feature - following up with Tao Shen. - had a call, Tao sent document (5 APIs), GUI page needs updating Leimeng will sent email, another meeting Friday
- Sireesh/Saravanan to followup with Sitharam for resources on AAF - CADI risk in Portal - Looking for response from Sitharam - meeting happened on 8/14
- Two resources expected from ECOMP's team (Sireesha and Hima/Hema).
- SITHARAMAN T R to provide list of resources for this task.
- Sunder Tattavarada and Manoop Talasila to prepare the plan and tasks for this feature and provide ETAs.
- Jonathan Gathman from AAF to provide support and guidance on all the AAF details. Had call with Jonathan, Sunder working on it, Saravanan - certificate work will be done after Sunder gives them info
- met with Jonathan 70% done;
- two steps 2.4 has rest implementation done; 2.5 will have CADI; email sent and partners
- Jonathan having a few roadblocks, has to make some changes
- Logging standards analysis done by Lorraine - link to the expected changes for logging - ONAP Application Logging Specification v1.2 (Casablanca)
- Micheal O Brien reviewing the logging changes that can be done in portal/sdk - followup -
.Jira Legacy server System Jira serverId 4733707d-2057-3a0f-ae5e-4fd8aff50176 key PORTAL-170 - Review the current MDCs in the "EPEELFLoggerAdvice.java" class and others that might have.
- Lorraine will follow up with Michael tomorrow .
- Review needs to be done with Sunder, Shireesha. Kotta by Sep 1st week with Michael's changes
- Some of the logging code is being refactored
- Micheal O Brien reviewing the logging changes that can be done in portal/sdk - followup -
...