Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

  1. Impacted components: SDNC, Ansible (CCSDK)
  2. Contributors: AT&T, China Mobile, Huawei
  3. Functionalities
    1. Leverage in-place software upgrade Beijing use case (minor changes) to demonstrate application to 5G RAN PNFs

    2. Complete generic building blocks for flexible upgrade workflow design

    3. Enhance precheck and postcheck steps with vendor specific rules

    4. Integrate the external controller into ONAP controller, and the EC will handle temporary states retrieval/storage/analysis of PNFsExternal controller would receive instructions from Ansible SDNC

    5. PNF ID, Expected Software Version, Controller Type, EC type, Rule Name and corresponding parameters can be specified at run time 

    6. Update A&AI entry with new PNF software version, as ‘active version’

    7. Support Batch software upgrade operations (stretch goal)

...