Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

  • This project provides users with the ability to design workflows based on a suite of existing capabilities exposed by other ONAP components. For example, a user can make calls to a controller to execute actions, to A&AI to get inventory status, and existing orchestration flows, and combine these calls to achieve a higher level orchestration function. SDC will be used for designing the workflows.
  • This project provides a capability to deploy (and undeploy) and upgrade the designed workflows to an execution environment (e.g., the service orchestrator). This assumes that the execution environment provides APIs to perform these functions.
  • This project provides runtime management (start, pause, resume, stop, rollback) and monitoring of the workflows.  This project provides a portal for a user to come in and manually control these workflows or monitor them or track the history of workflows that have been executed. Again we assume that the execution environment provides APIs to perform these functions. We also assume that other ONAP components (e.g., Policy) can trigger one of these workflows as part of a control loop action.
  • This project provides capabilities for scheduling workflows. The schedule could range across a subset of the instances of an NF, across instances of multiple NFs or combinations therein. For complex scheduling use cases we foresee the use of SNIRO Optimization Framework to be used as a home for specific scheduling optimization micro-services.
  • This project provides capabilities for selecting the type and instances of the NFs that need to be associated with the workflows (as well as for scheduling).
  • This project will document the best practices for End-to-End workflow design.


Beijing Release: We have reduced the functionality scope for Change Management in Beijing to execute a pre-defined workflow to carry out in-place software upgrade.

Other functionalities would be considered in subsequent ONAP releases.

RequirementProjectPoint of contact (PTL)
Status
Lock/unlock VNF instance A&AIJimmy Forysth jf2512@att.com

Status
colourGreen

Ansible code for in-place software upgrade vCPE / DemoEric Multanen eric.w.multanen@intel.com

Status
colourGreen

Software upgrade executionSDN-CDan Timoneydt5972@att.com

Status
colourYellow

Ansible server supportCCSDKDan Timoneydt5972@att.com

Status
colourYellow

Change workflow design and executionSOSeshu Kumarseshu.kumar.m@huawei.com

Status
colourGreen

User inteface for invoking upgrade workflowVIDOfir Sonsino os0695@intl.att.com 

Status
colourGreen

Testing of change design and executionIntegrationHelen ChenHelen.Chen@huawei.com

Status
colourGreen


Image RemovedImage Added

Architecture Alignment:

...