Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.
Comment: Modified question in the Assumptions section.

...

  • The 5G nodes consist of both PNFs (DU) and VNFs (CU). A single CU may consist of several VNFs.
  • Scope is limited to one PLMN without slicing.
  • A single vendor delivers RAN equipment and software.
  • A single service provider:
    • Owns or leases data center equipment, cell sites, physical transport, and any new equipment installed on these sites
    • Owns and operates the resulting RAN
    • Is the single user of the entire ONAP based management system
  • Use case covers only initial deployment of nodes. Thus, change management such as software upgrade is out of scope.

<Question-Karpura Suryadevara - re: 3rd bullet above)> Is there a specific reason why only single vendor is considered for all the components of RAN equipment and software ?

Preconditions

To clarify the limits of this use case for this release of ONAP the following preconditions are assumed:

...