- Reference VNFs (vFW/vLB)
- vLB/vDNS demo with patched VPP 1707 working in local OpenStack
- Next steps:
- Clean up and stabilize vLB/vDNS installation process
- Test the VNF in local environment, WindRiver lab, and Rackspace
- Test
- Provided assistance on CSIT questions and implementation
- vCPE use case
- Working on the Heat template that spin up the use case networks and VMs
- Reviewed detailed network design/configuration, need to clarify the network configuration between vGMUX-vGs
- Revised service model to mimic real life scenario better
- Discussed service model with SDC, no main issues identified
- Discussed service model and work flows with SO. Will continue the discussion with the goal of creating sample designs.
- Had a preliminary discussion with SDNC team to review features required. Will continue the discussion this week.
- VoLTE use case
- SDC/SO/Modeling teams have agreed upon the approach to support TOSCA template as input for VoLTE use case
- Reviewed an example of VoLTE TOSCA template from Open-O
- Discussed two blocking issues reported from DCAE team (how to do service registration/discovery in both VM and container environment)
- Finished the draft of VoLTE integration test cases
- SDC TOSCA template details have not been finalized, teams will have two more meetings to discuss this week
- Release / O-Parent
- Artifact versioning:
- ONAP will support individual artifacts having their own versions and release schedules
- Implementation details ongoing; should be finalized shortly
- Helped prepare custom Jenkins slave VM images via packer for team requiring custom build environment
- Code reviews and assistance on ci-management JJB submissions made by the community
- Artifact versioning:
- Intel Developer Labs:
- The Intel Hudson cloud (currently in use) has ~6TB storage, it is close to capacity.
- The Intel Pharos ONAP cloud (POD-25) is installed as of last week - this cloud includes 74TB of combined local and shared storage.
- POD-25 is awaiting IT approval for the external connections. The external connection is expected to be approved this week.
- Once the external connection is approved we will begin to move the development to Pharos POD-25
- The goal is to complete the move (move all ONAP developers from Hudson to Pharos) by the end of Aug.
- A request has been submitted to IT to connect POD-25 to POD-14 via a tunnel to allow a VXLAN connection, for deployment testing.
- Bootstrap
- Created Unit Tests that covers lib/aai script
- Refactor the current Unit Tests.
- E2E Integration Lab
- For VoLTE case, CMCC lab is redesigning and reconstructing network topology, will conclude before next week ideally.
- There are some discussion on how to integrate with each other between VoLTE case sponsors. They need reach some consensus before actions.
- For vCPE case, WindRiver and Intel Multi-geo lab will be the chosen to do the E2E test. Since there is no special requirements for hardware, it will be ready after intel team delivering relevant VPPs.
- Developer Lab
- War call has been organised with LF in order to close the following blocker issue
Jira Legacy server System Jira serverId 4733707d-2057-3a0f-ae5e-4fd8aff50176 key SO-21 - SO Docker has been created successfully on Nexus
- Marco has deployed the new SO image in the developer lab, resuming the testing
- War call has been organised with LF in order to close the following blocker issue