Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

V00014: VoLTE Auto-healing

Test Case IdV00014
Test Case NameVoLTE Auto-healing
DescriptionThis test covers the closed loop with alarm correlation and auto-healing
ReleaseAmsterdam
Preconditions
  1. VoLTE
closed loop
  1. service has been
configured
  1. instantiated
  2. VoLTE
service
  1. closed loop has been
instantiated
  1. configured and started
  2. SPGW VNF supports event generation
  3. VNF guest OS supports event generation
  4. MultiVIM supports event collection from guest OS and event forwarding
Testing Steps
  1. Use Robot test script to shutdown standby MPU VM inside SPGW VNF
Expected Results
  1. EMS collects standby MPU offline event from SPGW VNF and sends the event to VFC
  2. MultiVIM doesn't receive heartbeat event from standby MPU guest OS for a period of time and triggers alarm which is sent to DCAE VES collector
  3. Holmes receives MPU offline events
  4. Holmes receives MPU guest OS heartbeat missing events
  5. Holmes does correlation of the two types of events and generate one signature event and sends it to Policy
  6. Policy triggers provisional policy and reboot action is sent to VFC
  7. VFC uses VNFM driver to reboot standby MPU VM
  8. Standby MPU is reboot
  9. Clear event is sent from SPGW VNF about standby MPU back online
  10. Heartbeat from standby MPU VM is received by MultiVIM and clear event is sent by MultiVIM about heartbeat recovery
  11. Holmes does the event correlation and sends Clear signature event to Policy
  12. Policy stops the reboot action
Actual Results
Conclusion (Pass/Fail)
Testing LabCMCC OpenLab
Testing Date
Tester
Name

...

Name


V00015: VoLTE Service Termination

Test Case IdV00015
Test Case NameVoLTE Service Termination
DescriptionThis test covers VoLTE service termination process
ReleaseAmsterdam
Preconditions
  1. VoLTE service has been created
  2. Closed loop has been configured and started
  3. PEs have been configured and integrated with corresponding SDN WAN controller
  4. DC GWs have been configured and integrated with corresponding SDN local controller
Testing Steps
  1. ONAP user uses Usecase UI GUI to remove VoLTE service
Expected Results
  1. vEPC service is removed successfully, including all vEPC VNFs and VLs
  2. vIMS service is removed successfully, including all vIMS VNFs and VLs
  3. WAN service is removed successfully, including underlay and overlay networks
  4. Closed loop is stopped
  5. Holmes analytics container is removed by DCAE
  6. Closed loop related artifacts (including DCAE template, configurational policy and provisional policy, DG, workflows) are removed from ONAP
Actual Results
Conclusion (Pass/Fail)
Testing LabCMCC OpenLab
Testing Date
Tester Name