V00011: VoLTE Service Creation

Test Case IdV00011
Test Case NameVoLTE Service Creation
DescriptionThis test creates VoLTE service. To workaround SDC limitation on nested service support, in R1 we create separate dummy VNFs in VoLTE service, and link those VNFs to vEPC, vIMS and WAN services
ReleaseAmsterdam
Preconditions
  1. vEPC service has been created
  2. vIMS service has been created
  3. WAN service has been created
  4. All required ONAP artifacts (DG, DCAE template, Holmes
correlation rules
  1. blueprint, SO workflow, etc) have been designed
Testing Steps
  1. In SDC onboard the dummy VNF, called EPC, which links to vEPC service using ID property. Set the VNF controllerInfo to VFC
  2. Onboard the dummy VNF, called IMS, which links to vIMS service using ID property. Set the VNF controllerInfo to VFC
  3. Onboard the dummy VNF, called WAN, which links to WAN service using ID property. Set the VNF controllerInfo to SDNC
  4. Compose VoLTE service with EPC, IMS and WAN dummy VNFs
  5. Upload DG artifact in SDC
  6. Upload DCAE template
  7. Upload
Holmes correlation rulesUpload
  1. SO workflow
  2. Test and approve VoLTE service
  3. Distribute VoLTE service
Expected Results
  1. VoLTE service is created successfully
  2. VoLTE service is stored in catalog
  3. Service Creation event is sent via DMaaP
  4. Other modules (SO, VID, Usecase UI, CLAMP, VID, etc) receives the event
  5. VoLTE service is retrieved from SDC catalog by other modules
Actual Results
Conclusion (Pass/Fail)
Testing LabCMCC OpenLab
Testing Date
Tester Name


V00012: Closed Loop Configuration

Test Case IdV00012
Test Case Name

...

Closed loop configuration
DescriptionThis test uses CLAMP to configure closed loop for VoLTE
ReleaseAmsterdam
Preconditions
  1. DCAE template has been imported (R1 SDC doesn't support DCAE template design)
  2. Holmes blueprint has been imported
  3. Holmes correlation rules have been defined
Testing Steps
  1. In CLAMP, choose which VNF and event to monitor
  2. Bring up CLAMP configuration policy GUI and copy Holmes correlation rules in it
  3. Bring up CLAMP provisional policy GUI and define reboot provisional policy
  4. Save the configuration
Expected Results
  1. Closed loop template and blueprint for Holmes are distributed to DCAE
  2. Configuration policy has been distributed to DCAE
  3. Provisional policy has been distributed to Policy engine
Actual Results
Conclusion (Pass/Fail)
Testing LabCMCC OpenLab
Testing Date
Tester Name


- Instantiation: VNFs are deployed in edge and core data centers successfully. Intra data center network, underlay and overlay WAN network cross the two data centers are setup correctly

...