...
- Instantiation
- Performance based control loop
In this section we will show the work flows for the vFW and vDNS use case. Two section: one is the reference from the original prototype and the second is the new sequence diagram for Release 1.
0. Original Sequence Diagram (R0)
0.1 Onboarding (Old Flow)
0.2 Instantiation (old flow)
0.3 Control Loop for vFW (Old Flow)
0.4 Control Loop vDNS (Old Flow)
Release 1 Flows:
The order of flows would not be how CI testing would flow. that would be VNF Certification, Onboarding, CLAMP, Instantiation, Closed Loop vFW , Closed Loop vDNS and then Delete of vFW and vDNS.
1.1 Onboarding
1.2 Instantiation
1.3. Closed Loop vFW
1.4 Close Loop vDNS
1.5 CLAMP creation of control loops (new in R1)
1.6 VNF Certification (new in R1)
Control Automation:
See: Installing and Running the ONAP Demos
...