Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

  1. Designing the Control Loop:
    1. Model based (based on templates)
    2. Re-usable designs
  2. Configuring the Control Loop:
    1. VNF driven, future should be SERVICE driven
    2. Defining threshold values…
  3. Deploying the Control Loop:
    1. Sending template towards DCAE, Policy, …
  4. Lifecycle Management of the Control Loop:
    1. Stopping/re-starting/updating
    2. Monitoring (visualization of the Loop)(future not in R1)
    3. Trial mode, production mode, ….(future not in R1)
    4. Activation (manually and/or triggered by a policy(future not in R1) and/or tied to the vnf startup(future not in R1))


 Architecture Alignment

...